Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2015, Vol. 44 ›› Issue (03): 19-22.

Previous Articles     Next Articles

Optimization of Stage Height Plan in Gently Inclined Multilayer Deposits Based on 3DMine

Zhang Mengmeng1,Ye Yicheng1,2,Lu Yaqi1,Lu Fang1   

  1. 1.College of Resources and Environmental Engineering,Wuhan University of Science and Technology,Wuhan 430081,China;2.Hubei Province Engineering Technology Research Center of High Efficient Clean Utilization Shale Vanadium Resource,Wuhan 430081,China)
  • Online:2015-03-15 Published:2015-07-31

Abstract: Research on optimization of stage height plan in mining deposit is one of the tasks that have a direct relationship to the safety reliability and management benefit in mining production.Taking a development system of some gently inclined multilayer deposits as foundation,a 3D development system model was built first by using the 3D visualization technology of 3DMine mining software to realize the 3D visualization of the underground mining engineering of the complex multilayer deposits;Secondly,the stage development engineering entity model was built based on a CAD design,with the functions of multi-dimensional visualization of middle-section developing engineering,calculation of the mining capacity,and computation of the engineering quantities.And the models' dynamic section and transparency were shown as well;Lastly,the stage height optimizing plan with minimum unit stage quantities was taken to optimize the four alternative plans.The optimized plan is consistent with the actual mining,which verifies that the 3D visualization optimization of stage height is reliable and practicable.

Key words: 3DMine, Gently inclined multilayer deposits, Stage height, Optimization plan