[1] |
XIANG Juan, CHEN Zhan-Feng, FAN Wen-Chen.
Stability Analysis of Lakeside Open-pit Slope in Chengmenshan Copper Mine by Considering Seepage Influence
[J]. Metal Mine, 2019, 48(01): 163-167.
|
[2] |
LI Dong-Yin.
The Construction Measures and Methods for Waste Dump of Open Pit Metal Mine in Hylaea Area of South America
[J]. Metal Mine, 2018, 47(12): 163-166.
|
[3] |
ZHOU Sheng, YANG Cheng-Xiang, HU Hui-Shu, CHEN Ping, LEI Ding-Ding, LI Guang-Ze, JIANG Wei.
Research and Practice on Optimization of Waste Dump Engineering of Mirador Copper Mine
[J]. Metal Mine, 2018, 47(10): 167-171.
|
[4] |
LI Huai-Bin, ZHAO Xing-Dong, ZHAO Yi-Fan, LI Yang-Yang- .
Study on Dynamic Safety Distance of Supporting Structure Under Dynamic Blasting Load
[J]. Metal Mine, 2018, 47(03): 68-70.
|
[5] |
CAO Bo, TAO Ya-Bin, LIU Zhong-Hong, LI Guang-He, CHENG Ji-Chao.
Spatial Formation Optimization of Composite Slope of Single Thick Coal Seam of Zhundong Open-pit Coal Mine in Xinjiang
[J]. Metal Mine, 2017, 46(07): 47-50.
|
[6] |
ZHANG Ya-Bin, ZHANG Yun-Peng, CHEN Chao.
Slope Critical Vibration Velocity and Safety Distance Calculation under the Blasting Dynamic Load
[J]. Metal Mine, 2016, 45(02): 137-140.
|
[7] |
ZHANG Mo, WANG Bin, ZHOU Yu-Xin, ZHU Jun-Xing.
Inversion Analysis of Safety Factor on Shear Strength of Waste Dump Bulk Materials
[J]. Metal Mine, 2015, 44(05): 171-174.
|
[8] |
LI Chuan-Lin, WANG Yong-Zeng, WANG Rui.
Stability Analysis of Capacity Increase and Heightening Progress of Qidashan Waste Dump
[J]. Metal Mine, 2015, 44(04): 166-168.
|
[9] |
MI Zi-Jun.
Active Regulation Mechanism of Mine Waste Dump Stability
[J]. Metal Mine, 2014, 43(09): 1-6.
|
[10] |
ZHOU Ya-Bo, LI Ke-Min, XIAO Shuang-Shuang, ZHANG Guang-Chao.
Heap Parameters Optimization of Open-pit Mine Waste Dump
[J]. Metal Mine, 2014, 43(03): 48-51.
|
[11] |
MU Gui-Qing, 吕Shu-Ran , WANG Ji-Fei.
Study on Influence of Waste Dumping to Cover Slope to Stability of Tailings Dam
[J]. Metal Mine, 2013, 42(12): 108-110+122.
|
[12] |
WANG Rui, WANG Yong-Zeng, LU Zhan-Guo.
The Slope Parameters Optimization and Stability Analysis of Qidashan Waste Dump
[J]. Metal Mine, 2013, 42(02): 41-43.
|
[13] |
REN Wei, LI Xiao-Chun, WANG Shao-Quan, SHI Lu.
Model Test Study on Failure Process and Stability of Dump Site
[J]. Metal Mine, 2012, 41(08): 28-33.
|
[14] |
LU Sha, ZHANG Ruo-Meng, TANG Xiao-Ling, HU Xian-Zhou.
Research on Soil Improvement-Ecological and Environmental Reconstruction in Mine Waste Dump
[J]. Metal Mine, 2011, 40(09): 137-140+148.
|
[15] |
Sun-Shi-Guo, FAN Cai-Bing, LI Zhan-Ke, LU Hai, HAN Sheng-Lei.
Stress Fields Evolution Law in the Piling-up Process of Waste Dump of Huge Soft Hill Base
[J]. Metal Mine, 2010, 39(08): 36-38.
|