[1] |
QIN Peng-Fei.
Application of Limit Equilibrium and Numerical Method in Slope Engineering
[J]. Metal Mine, 2020, 49(06): 204-209.
|
[2] |
ZHAO Jia-Zheng, LI Ning, YE Hai-Wang, WANG Li-Guan, WANG Qi-Zhou, LEI Tao.
Synergetic Optimization Study of Open Pit Truck Shovel Based on Extended Summation Algorithm of Closed Queuing Network
[J]. Metal Mine, 2020, 50(05): 151-157.
|
[3] |
Gu-Qing-Hua, 吕Yan-Hong, Lu-Cai-Wu, Ruan-Shun-Ling.
Modeling and Algorithm of Multi-objective Production Scheduling Optimization for Multi-metal Open-pit Mine
[J]. Metal Mine, 2020, 49(04): 147-153.
|
[4] |
XIANG Juan, CHEN Zhan-Feng, FAN Wen-Chen.
Stability Analysis of Lakeside Open-pit Slope in Chengmenshan Copper Mine by Considering Seepage Influence
[J]. Metal Mine, 2019, 48(01): 163-167.
|
[5] |
SUN Guang-Lin, HU Jiang-Chun, BIAN Ya-Dong, TAO Zhi-Gang, LIANG Ming-Xing.
Research and Application of Open Pit Slope Shallow Surface Nondestructive Detection Technology
[J]. Metal Mine, 2018, 47(04): 58-62.
|
[6] |
XU Jia-Chen, SHOU Zhen-Yu, ZENG Xiao-Xiang, CAO Qi-Guang-Liu-Tao.
Study on the Slope Stability of the Tailing Pond Built at Open-pit Stope in Dongshan Iron Mine
[J]. Metal Mine, 2016, 45(07): 175-178.
|
[7] |
ZHANG Lin.
Technical Progress and Development Trend of Open Pit Mining in Metal Mines of China
[J]. Metal Mine, 2016, 45(07): 20-25.
|
[8] |
HU Jun, WANG Kai-Kai, HUANG Gui-Chen.
Searching for the Slip Surface of Soil Slopes Based on the Breeding Fish Algorithm
[J]. Metal Mine, 2016, 45(02): 132-136.
|
[9] |
HAN Xin-Ping, WU Chong, WANG Ming-Jun.
Design of Intelligent Blasting System in Open Pit Mine Based on Internet of Things
[J]. Metal Mine, 2015, 44(04): 250-254.
|
[10] |
ZHANG Bing-Tao, LIU Yan-Zhang, LI Hai-Long, ZHANG Qun, LU Pei-Pei, LIU Wei.
Study on Dynamic Reclamation Mode of Chaoguo Open Pit Mine
[J]. Metal Mine, 2015, 44(04): 61-65.
|
[11] |
HU Jun, ZHONG Long.
Exploration for Open-pit Mine Blasting Load Equivalent Way
[J]. Metal Mine, 2014, 43(06): 37-41.
|
[12] |
JIA Zhu-Ping, ZHENG Lu-Jing, ZHENG Lu-Lin.
Stability Analysis and Treatment Scheme of Large-scale Landslide of Open Pit Slope
[J]. Metal Mine, 2014, 43(05): 27-31.
|
[13] |
XU Li-Sheng, DAI Bi-Bo, JIANG Peng-Fei.
3D Visualization Programming Process of Production Plan Scheduling for Open Pit Mine
[J]. Metal Mine, 2014, 43(01): 20-24.
|
[14] |
ZHANG Guang-Chao, LI Ke-Min, MA Li, XIAO Shuang-Shuang.
Study and Application on Truck Tire Selection for Open Pit Mine
[J]. Metal Mine, 2013, 42(04): 109-112.
|
[15] |
KANG Rui-Fang, WANG Chang-Jun, FAN Jian-Wei, XIE Xing, XING Hong-Yu, YU Rui.
Study on Deformation Monitoring and Fracture Characteristics of High-steep Slope in Nanfen Open-pit Mine
[J]. Metal Mine, 2013, 42(01): 38-41.
|