[1] |
ZHU Junge, YU Hongyu, WANG Haodong, MA Qiangying, LU Zengxiang.
Research on Scheduling of Underground Trackless Vehicle Based on Right-of-way Priority
[J]. Metal Mine, 2024, 53(3): 53-.
|
[2] |
ZHANG Yongxi, XIANG Jiangbo ZHOU Keping, YOU Xintian FU Yiling YANG Chengye, XU Chun, CHENG Xiliang.
Research and Application of Multi-equipment Collaborative Intelligent Mining System in Zijinshan Gold and Copper Mine Underground Mining Site
[J]. Metal Mine, 2024, 53(01): 55-63.
|
[3] |
QIN Ruibo, ZHU Wancheng, XU Xiaodong, LI Hui, CHEN Chengzhen, SONG Qingwei .
Construction of Underground Stope Environment Perception Test Platform After Blasting Based on Mixed Reality Technology
[J]. Metal Mine, 2023, 52(03): 185-192.
|
[4] |
MA Xinbo, JING Hongdi, LIU Xiaobo, YU Jianyang, SUN Xiaoyu.
Study on Inspection System of Underground Mine Equipment Based on Mixed Reality
[J]. Metal Mine, 2022, 51(09): 188-193.
|
[5] |
LI Wenjing, JIAO Yuhao, QIU Li, ZHANG Xinxin, REN Dajun.
Parametric Modeling of Mine Roadway Based on Dynamo
[J]. Metal Mine, 2022, 51(09): 63-70.
|
[6] |
WANG Hao, HU Nailian, LI Guoqing, HOU Jie, QIANG Xingbang.
Research and Development of Short Interval Control Management System for Underground Mine Scheduling
[J]. Metal Mine, 2022, 51(01): 213-220.
|
[7] |
LI Jielin, YANG Chengye, ZHOU Keping, LI Zhihong.
Coupling Synergy Degree Evaluation of Mining Technology for Trackless and Rail Combined Mining in Underground Mines
[J]. Metal Mine, 2021, 50(03): 74-79.
|
[8] |
WU Haojun, JI Hongguang, GONG Min, LIU Xiangyu.
Present Application Status of Rock Drilling Equipment in Underground Mine and the Development Direction for Intelligent Rock Drilling in China
[J]. Metal Mine, 2021, 50(01): 185-201.
|
[9] |
ZHANG FengJie, DAI Bibo, YANG Xiaoming.
Study on Large Capacity Routing and Wavelength Assignment Algorithms for Wavelength Division Multiplexing Optical Networks for Information Transmitting in Underground Mines
[J]. Metal Mine, 2020, 49(11): 66-70.
|
[10] |
ZHANG Bo, JIANG Zhong-An, DUAN Zhi-Bo, JI Yin-Feng.
Study on the Dust Removal Effect of Air-water Spraying Nozzle
[J]. Metal Mine, 2019, 48(08): 173-178.
|
[11] |
XU Xiu-Ping, WAN Li-Li.
Research on the Key Regions and Time Quantum of the Dust Controlling in the Process of Non-coal Underground Mining
[J]. Metal Mine, 2016, 45(06): 153-156.
|
[12] |
GU Xin-Yu, SHI Jun-Wen, WANG Ting-Yin.
Direct Dust Fall Technology for Chamber in Underground Metal Mine
[J]. Metal Mine, 2016, 45(03): 160-162.
|
[13] |
CUI Xiao-Rong, LIN Mou-Jin, YU Hong, ZHENG Bing-Xu.
Research of Exploitation Procedures of Open-pit Mines Transferred from Underground Mining
[J]. Metal Mine, 2016, 45(02): 30-35.
|
[14] |
GUO Qi-Chen, LI Wen-Ping, WANG Qi-Qing, YANG Dong-Dong.
Prediction and Analysis to Affecting Factors of Surface Mining Subsidence in the Mining Area of Shallow Coal Seam with Thin Bedrock
[J]. Metal Mine, 2015, 44(12): 161-164.
|
[15] |
YUAN Guo-Bin, YANG Zhi-Qiang, GAO Qian, JIN Xue-Qi.
Construction Technology of Main Shaft Repair in Second West Mining Area of JinChuan LongShou Mine
[J]. Metal Mine, 2015, 44(07): 34-38.
|