[1] |
WANG Quanming, YANG Yujiang, LU Zengxiang, MA Chi, CAO Peng.
Prediction Model of Borehole Lithology Distribution Characteristics Based on Legendre Polynomial Approximation
[J]. Metal Mine, 2022, 51(03): 65-70.
|
[2] |
ZHAO Jia-Zheng, LI Ning, YE Hai-Wang, WANG Li-Guan, WANG Qi-Zhou, LEI Tao.
Synergetic Optimization Study of Open Pit Truck Shovel Based on Extended Summation Algorithm of Closed Queuing Network
[J]. Metal Mine, 2020, 50(05): 151-157.
|
[3] |
LU Hong-Jian, WANG Yi-Ren, LI Cheng-He, LI Sheng, LI Xiao-Dong, DU Ying-Nan.
Tailings Synergetic Filling Cleaner Production of Open Pit and Underground Goaf in Metal Mine
[J]. Metal Mine, 2020, 50(05): 137-143.
|
[4] |
Gu-Qing-Hua, 吕Yan-Hong, Lu-Cai-Wu, Ruan-Shun-Ling.
Modeling and Algorithm of Multi-objective Production Scheduling Optimization for Multi-metal Open-pit Mine
[J]. Metal Mine, 2020, 49(04): 147-153.
|
[5] |
XIANG Juan, CHEN Zhan-Feng, FAN Wen-Chen.
Stability Analysis of Lakeside Open-pit Slope in Chengmenshan Copper Mine by Considering Seepage Influence
[J]. Metal Mine, 2019, 48(01): 163-167.
|
[6] |
YU Chen, TANG Ming-Jie, WANG Da-Guo, LI Sha-Sha.
Evaluation on Suitability of Land Reclamation in Open Pit Based on FAHP-Entropy Weighting Method
[J]. Metal Mine, 2018, 47(11): 138-143.
|
[7] |
ZHANG Lin, DAI Bi-Bo, WANG Yun-Min, Mou-Ying-Jie.
Study on Economic Dynamic Assessment Optimization Technology of Production Capacity Open-pit Mine:A Case Study of Dongjielegele Iron Mine in Baiyunebo
[J]. Metal Mine, 2018, 47(11): 13-17.
|
[8] |
SUN Guang-Lin, HU Jiang-Chun, BIAN Ya-Dong, TAO Zhi-Gang, LIANG Ming-Xing.
Research and Application of Open Pit Slope Shallow Surface Nondestructive Detection Technology
[J]. Metal Mine, 2018, 47(04): 58-62.
|
[9] |
LI Yu-Fei, YE Yi-Cheng, HU 南Yan, HU Sheng-Dong, LUO Bin-Yu, YUAN Zhou-Hao.
Research on Safety Thickness of Goaf Roof under Open Pit Mining Based on Energy Law
[J]. Metal Mine, 2018, 47(02): 35-40.
|
[10] |
HUANG Min, LI Xue-Hua, JIA Min.
Mathematical Model of Mining Operative Plan for an Open Pit Mine with Two-element Integer Programming
[J]. Metal Mine, 2018, 47(01): 152-155.
|
[11] |
FAN Qing.
Effect on Stability of Underground Mining of Old Open-pit and Seepage Field of Hongqi Iron Mine
[J]. Metal Mine, 2016, 45(09): 40-43.
|
[12] |
XU Jia-Chen, SHOU Zhen-Yu, ZENG Xiao-Xiang, CAO Qi-Guang-Liu-Tao.
Study on the Slope Stability of the Tailing Pond Built at Open-pit Stope in Dongshan Iron Mine
[J]. Metal Mine, 2016, 45(07): 175-178.
|
[13] |
ZHANG Lin.
Technical Progress and Development Trend of Open Pit Mining in Metal Mines of China
[J]. Metal Mine, 2016, 45(07): 20-25.
|
[14] |
LIU Bin, HOU Da-De, SUN Guo-Quan.
Stability Analysis of Underground Mining Area after Tailings Backfilling into Deep Sunken Open Pit
[J]. Metal Mine, 2016, 45(03): 30-34.
|
[15] |
DENG Wen-Xue, YANG Tian-Hong, 南Shi-Qing , SONG Bin-Bin.
Determination of Mechanics Parameters of Rock Mass in Sijiaying Iron Mine East Slope and Its Stability Analysis
[J]. Metal Mine, 2016, 45(03): 15-19.
|