Delay Time Interval Optimization of Electronic Detonator Based on Spectrum Analysis and Linear Superposition of Seismic Wave
HE Li1,2 XIE Xianqi2,3 HAN Chuanwei3 ZHONG Dongwang1 WANG Honggang3 HUANG Xiaowu3 HUANG Binlin3
1. Hubei Province Key Laboratory of Systems Science in Metallurgical Process, Wuhan University of Science and Technology, Wuhan 430065, China;2. Hubei Key Laboratory of Blasting
Engineering,Wuhan 430056,China;3.Wuhan Explosions & Blasting Co.,Ltd.,Wuhan 430056,China
HE Li, XIE Xianqi, HAN Chuanwei ZHONG Dongwang WANG Honggang HUANG Xiaowu HUANG Binlin. Delay Time Interval Optimization of Electronic Detonator Based on Spectrum Analysis and Linear Superposition of Seismic Wave[J]. Metal Mine, 2021, 50(11): 41-48.