[1] |
HE Zhong-Guo, JI Xiao-Fei, YIN Xu-Yan.
Structure Parameter Optimization of the Medium-hole Pillar Caving Method with Mining Preparation out of Veins and Subsequent Backfilling
[J]. Metal Mine, 2016, 45(11): 54-57.
|
[2] |
LI Jia-Feng, LIU Chang-Wu, LIU De-Feng, JIANG Yuan.
Application of Double Joist Steel Shed Support Technology in Large Section Open-off Cut of the Lower Slice
[J]. Metal Mine, 2016, 45(06): 55-58.
|
[3] |
YANG Ren-Shu, XU Peng, YANG Li-Yun, DING Chen-Xi.
Study of Regularity of Explosive Stress Wave Propagation in Jointed Rock Mass
[J]. Metal Mine, 2016, 45(06): 49-54.
|
[4] |
LIU Bin, HOU Da-De, SUN Guo-Quan.
Stability Analysis of Underground Mining Area after Tailings Backfilling into Deep Sunken Open Pit
[J]. Metal Mine, 2016, 45(03): 30-34.
|
[5] |
LIU Bin, HOU Da-De, SUN Guo-Quan.
ABAQUS Simulation of Pressure Relief Control Technology for High-stress Roadway
[J]. Metal Mine, 2015, 44(11): 45-50.
|
[6] |
XU Yong-Fu, WANG Wei-Feng, ZOU Sheng-Yong, DU Bo, LIU Jin-Jun.
Influence of Wrap Angle of Tower Hoist on the Friction Wheel Stress
[J]. Metal Mine, 2014, 43(09): 121-125.
|
[7] |
YE Ding-Yang, LIU Chang-Wu, LIU Yang, HE Tao.
Application of Combined Support Technology in Large Span Open-off Cut under Artificial Regenerated Roof
[J]. Metal Mine, 2014, 43(02): 55-58.
|
[8] |
ZHANG Wen-Tao, CHEN Qun-Zhong, LI Ai-Jun, LEI Xi-Liang, DAI Zi-Dong.
Once-tunneling Construction Technology of Large Cross-section Open-off Cut in Fully-mechanized Face
[J]. Metal Mine, 2013, 42(07): 20-23.
|
[9] |
ZHANG Li-Ting, LU Zhi-南, LI Qiang, ZHANG Jun.
3D Dynamic Stability Analysis of the Tailing Dam under Earthquake Action
[J]. Metal Mine, 2013, 42(06): 121-125.
|
[10] |
XIAO Yu, HAN Li-Jun, ZHANG Yang, MEI Feng-Qing.
Study on Support and Construction Technology of Three-dimensional Oblique Intersection with Large Section
[J]. Metal Mine, 2013, 42(05): 34-36+40.
|
[11] |
GAO Lin, XU Guo-Qiang, LI Guo-Feng.
Numerical Simulation on the Coupling Support Scheme of Deep Soft Rock Roadway
[J]. Metal Mine, 2013, 42(05): 1-4+9.
|
[12] |
MEI Feng-Qing, HAN Li-Jun, MENG Qing-Bin, LI Yun.
Reasonable Supporting Techniques of Open-off Cut Pilot Tunnel in the Very Soft Layer
[J]. Metal Mine, 2013, 42(03): 52-56.
|
[13] |
LIU Xiao-Bo, PENG Jian-Yu.
Goaf Roof Failure Mechanism and its Security Thickness
[J]. Metal Mine, 2012, 41(11): 5-8.
|
[14] |
ZHU Jian-Ming, YANG Chong.
Support Parameter Optimization of Extremely Large-section Open-off Cut in Secondary Tunneling
[J]. Metal Mine, 2012, 41(09): 9-12+145.
|
[15] |
HAN Jian-Bo, ZHANG Li-Ting, LI Qiang, ZHOU Zhan-Lei.
Study on the Stability of Tailing Dam by Strength Reduction Methods Based on Fluid-Solid Coupling Theory
[J]. Metal Mine, 2011, 40(11): 29-32.
|