Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2012, Vol. 41 ›› Issue (07): 50-52+55.

Previous Articles     Next Articles

Numerical Simulation of Reinforced Concrete Double Arched Bridge Demolition Blasting

She Yong1,Chi En′an1,2,Zhao Mingsheng1   

  1. 1.Guizhou Xinlian Blasting Engineering Limited Corp;2.Mining College, Guizhou University
  • Online:2012-07-15 Published:2012-07-26

Abstract: In order to ensure Ceheng ledges bridge demolition blasting is carried out smoothly, a common node separate model which is considering the mechanical difference between steel and concrete during blasting was established based on the ANSYS/LS-DYNA platform, then the blasting program before demolition blasting was simulated.The simulation results show that the program which shallow hole blasting and deep hole blasting in combination is entirely feasible, thus this program for blasting construction is used.Through the comparative analysis with the actual blasting process, the numerical simulation technique can verify and optimize the blasting program.It can effectively guide the blasting construction, and it has important theoretical significance and practical value.

Key words: Demolition blasting, Reinforced concrete arched bridge, Numerical simulation, Common node separate model