Metal Mine ›› 2013, Vol. 42 ›› Issue (01): 66-69.
Previous Articles Next Articles
Zhang Mingfeng,Su Jianjun,Jiang Renyi
Online:
Published:
Abstract: The Alden-topkan lead-zinc mine's geological feature and current situation are introduced briefly.Through analyzing and computing,and contrasting the comprehensive technical and economic index,the main mining technical schemes of construction scale,development schemes,mining method and main mining equipment for recovering production are determined.The practice in the mine's design and its production recovery shows that this main mining technical scheme is suitable for the mine to resume production of specific conditions,and is available for reference of similar mines.
Key words: Mine abroad, Recovering production, Mining technical schemes, Comprehensive technical and economical comparison
ZHANG Ming-Feng, SU Jian-Jun, JIANG Ren-Yi. The Mining Technical Schemes for Recovering Production of Alden-topkan Lead-Zinc Mine[J]. Metal Mine, 2013, 42(01): 66-69.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.jsks.net.cn/EN/
http://www.jsks.net.cn/EN/Y2013/V42/I01/66