Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2014, Vol. 43 ›› Issue (04): 39-43.

Previous Articles     Next Articles

Discussion of Floor-Contact of Cemented Stowing Method in 14#-5 Ore body of Laochang Granite

Zhang Chunfang   

  1. Yunnan Tin Group Laochang Mine,Gejiu 661007,China
  • Online:2014-04-15 Published:2014-09-05

Abstract: During the mining process with upward horizontal slicing and cemented stowing method in multi-metal contact zone sulfide ore body of high quality,high value,high sulfur combustion characteristics and gently dipping medium thickness,the traditional floor-contact methods,artificial floor-contact and slurry pressurized floor-contact,are not applicable.In order to solve this problem,a floor-contact method-“mortar nature angle of repose method” is designed by using nature angle of repose of stowing material which had flowed in gob.Three floor-contact methods with the aid of inverted bell-mouth or stowing small rise are proposed to realize the floor-contact under three deferent conditions.First,the roof surrounding rock of ore body is horizontal or nearly; Second,the roof surrounding rock on one side of filling filter well is higher than that on the other side(the dip angle is greater than 6°); Third,the roof surrounding rock on one side of stowing filter well is lower than that on the other side.This method sets a good example for the mine with stowing method.

Key words: Stowing method, Floor-contact problem, Mortar nature angle of repose method, Roof surrounding rock, Inverted bell-mouth