[1] |
MIAO Zuohua, TANG Yang, REN Lei, WANG Mengting, XIE Yuan, ZHAN Chuan, LI Hongliang.
Study on Mine Video Monitoring Technology Based on 3D Video Fusion
[J]. Metal Mine, 2023, 52(09): 173-179.
|
[2] |
ZHANG Bingbing, LI Pingfeng, XIE Shoudong, CHEN Guangmu, CHEN Jingjing, HUANG Dongxing.
Analysis of Muckpile Shape in Open-pit Mine Based on UAV Aerial Survey Technique
[J]. Metal Mine, 2022, 51(09): 161-166.
|
[3] |
HUANG Qing-Qing, YANG Tian-Hong, YU Qing-Lei, ZHANG Peng-Hai, LIU Hong-Lei.
Research on 3D Visualization and Cloud Data Transmission of Open-pit Iron Ore Based on Unity 3D Platform
[J]. Metal Mine, 2019, 48(04): 138-141.
|
[4] |
ZHANG Peng, GAO Yu-Shan, TAO Zhi-Gang, CHEN Zhuang.
Landslide Disaster Risk Evaluation and Dynamic-Informational Risk Zoning of Open-pit High Slope
[J]. Metal Mine, 2016, 45(01): 166-170.
|
[5] |
WU Chao, WANG Hai-Feng, WANG Shi-Dong.
3D Visualization Technology of the Mining Area Land Reclamation Plan
[J]. Metal Mine, 2015, 44(11): 128-132.
|
[6] |
JIAN Run-Tang, YANG Fan, WANG Yan-Mei, HAN Yan-Wei.
Reserve Estimation and Establishment of Three-dimensional Geological Model of Bairong-Gangjiang Cu(Mo) Deposit,Tibet
[J]. Metal Mine, 2015, 44(09): 95-99.
|
[7] |
LIU Xi-Ge, YANG Tian-Hong, ZHANG Peng-Hai, ZHU Wan-Cheng.
Numerical Simulation of Rock Mechanics and 3D Visualization Based on Virtual Reality Technology
[J]. Metal Mine, 2015, 44(08): 20-23.
|
[8] |
JING Yong-Bin, DAI Bi-Bo, SUN Guang-Zhong.
Techniques for Three-dimensional Modeling and Visualizing of Borehole Data
[J]. Metal Mine, 2015, 44(06): 98-102.
|
[9] |
欧Yang-Shi-Yuan , SHI Yong-Gui, CAO Wen-Sheng.
Development of Automatic Monitoring and Pre-warning System for Groundwater in Fankou Lead-zinc Mine
[J]. Metal Mine, 2015, 44(04): 267-272.
|
[10] |
BAI Run-Cai, DENG Chao, LIU Guang-Wei.
3D Visualization System of Blasting Design of Open-pit Mine1
[J]. Metal Mine, 2014, 43(09): 116-120.
|
[11] |
LIU Ya-Jing, WANG Jian-Jia.
On the 3D War-gaming System Structure of the Underground Mining Engineering in Metal Mines
[J]. Metal Mine, 2014, 43(04): 139-142.
|
[12] |
XU Li-Sheng, DAI Bi-Bo, JIANG Peng-Fei.
3D Visualization Programming Process of Production Plan Scheduling for Open Pit Mine
[J]. Metal Mine, 2014, 43(01): 20-24.
|
[13] |
ZHANG Yao-Ping, YANG Shuang-You, LU Zhi-Gang, SU Xiao-Ping, XIA Yi-Jiang.
3D Visualization Processing and Analysis of Surface Subsidence Rule of a Mined-out Area
[J]. Metal Mine, 2013, 42(08): 120-123.
|
[14] |
GU Wei, TAN Zhi-Xiang, DENG Ka-Zhong.
3D Visualization Prediction of Mining Subsidence System Based on the Active X Automation
[J]. Metal Mine, 2013, 42(03): 119-122.
|
[15] |
YANG Jun, SONG Lei, ZHANG Peng.
Research on Slope Displacement Monitoring Data GIS Visualization Analysis of an Open-pit Mine
[J]. Metal Mine, 2012, 41(11): 113-115.
|