Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2015, Vol. 44 ›› Issue (12): 38-41.

Previous Articles     Next Articles

Horizontal Tunnel Rapid Excavation Construction Method in Loose Formation

Li Yuexian1,Shen Yanchen1,Zhang Guanzhou2,Chen Zhuo3,4,Zhao Pushan5,Guo Jingming6   

  1. 1.Nanjing Water Resources Research Institute,Nanjing 210029,China;2.College of Defense Engineering,PLA University of Science and Technology,Nanjing 210007,China;3.College of Field Engineering,PLA University of Science and Technology,Nanjing 210007,China;4.No.71887Troops of PLA,Yantai 265800,China;5.Headquarters of Nanjing Military Region,Nanjing 210007,China; 6.No.65587 Troops of PLA,Siping 136001,China
  • Online:2015-12-15 Published:2016-03-09

Abstract: In order to grasp the rapid construction theory and construction technology and operation method of non-construction supporting of horizontal tunnel in loose strata,a thorough analysis on the rapid construction case of the double rows-double layers long distance water diversion culvert in loose formation was made.Based on the friction around jacking pipe,face pressure and the self weight of the pipeline,the jacking force calculation and the new construction process and technology for rapid tunnel construction of metal mines horizontal tunnel in loose formation were acquired.An in-site jacking experiment and various monitoring were carried on and the measured jacking force was contrasted with the three calculated values.The comparison of the relevant technical and economic indicators between the rapid excavation and construction method and the construction supporting method verified the progressiveness,feasibility and applicability of the rapid excavation construction method.

Key words: Loose formation, Rapid excavation, Jacking construction, Jacking force calculation, In-site experiment