[1] |
ZHANG Wenge, WANG Jiachuang, DONG Longjun, GONG Suwen, LUO Caiyan, HAO Chenliang, CAO Heng, YAN Xianhang.
Optimization Design of Microseismic Monitoring Scheme for High Steep Rock Slope and Identification of Hidden Danger Zones
[J]. Metal Mine, 2023, 52(09): 69-75.
|
[2] |
YANG Chun-Cheng.
Stability Analysis of Hanging Wall Rock at Sublevel Stope and Its Engineering Application in a Mine
[J]. Metal Mine, 2019, 48(04): 20-25.
|
[3] |
GE Yong-Xiang, ZHANG Cong-Rui, WANG Wei, LEI Gao, REN Gao-Feng, WU Qi.
Study on the Stability of Interval Pillar Recovery under the Complex Backfilling Body in Sanxin Gold and Copper Mine
[J]. Metal Mine, 2018, 47(12): 27-33.
|
[4] |
LOU Xiao-Ming, HUANG Shen, HAN Xue-Jing, ZHOU Ping.
Rheological Mechanical Analysis on Disaster of Pillar-roof System in Goaf
[J]. Metal Mine, 2018, 47(11): 44-48.
|
[5] |
JIA Han-Wen, ZHOU Ya-Bo, LIU Long, LIU Xi-Ge, YAN Bao-Xu.
Research of Mining Method for Recovering Cap Pillar of Goaf at 728 m Level in A′erhada Pb-Zn Mine
[J]. Metal Mine, 2018, 47(01): 42-46.
|
[6] |
YE Guang-Xiang, WANG Liu, ZHANG Shu-Biao, JIANG Yong-Heng, YE Ji-Huan.
Study on the Safe Recovery Technique of Pillars of Complicated Multi-layer Goafs
[J]. Metal Mine, 2017, 46(06): 61-65.
|
[7] |
WANG Qing-Yuan, ZHU Wan-Cheng, LIU Kai, HOU Chen.
Mining Method Optimization for Recovering Crown Pillar in Xincheng Gold Mine Based on Catastrophe Progression Method
[J]. Metal Mine, 2015, 44(12): 24-28.
|
[8] |
HU Bao-Wen, LI Chang-Hong, WEI Xiao-Ming.
Impact of Mining Space Variation on Stope Ground Pressure with Respect to Pillarless Sublevel Caving
[J]. Metal Mine, 2015, 44(12): 5-9.
|
[9] |
LIU Zhi-Yi, HOU Jin-Liang, ZHAO Guo-Yan, REN He-Xu, XUE Zhen-Lin.
Engineering Application and Stability Analysis of the Hanging Wall Rock of the Second-step Stope
[J]. Metal Mine, 2015, 44(11): 143-148.
|
[10] |
LIU Wu-Tuan, ZHAO Kui, HU Jing-Tao, RAO Zhao-Xun, LIU Ming-Rong.
Stability of Pillars Recovery in an Iron Ore
[J]. Metal Mine, 2014, 43(08): 162-165.
|
[11] |
MA Xiong-Zhong, WANG Wen-Jie, MA Sheng-Hui.
Study on Spacer Pillar Stoping and Goaf Stability Numerical Simulation of Fozi Mine
[J]. Metal Mine, 2014, 43(02): 22-25.
|
[12] |
WANG Jun-Min, LI Xiu-Chang, JIANG Guang-Long, MA Qing-Fei.
Study on the Underground Pressure Monitoring and Underground Pressure Control Measure for Jinfeng Mining
[J]. Metal Mine, 2013, 42(12): 27-30.
|
[13] |
GUAN Kai, ZHU Wan-Cheng, ZHANG Hong-Xun, WANG Qing-Yuan, WEI Chen-Hui.
Optimization of Panel Mining Sequence for the Middle-section Top Pillar of Xincheng Gold Mine
[J]. Metal Mine, 2013, 42(09): 44-49.
|
[14] |
REN Wei-Dong.
Application of the New Technology of Stope Pillar Recovery
[J]. Metal Mine, 2013, 42(07): 8-11+16.
|
[15] |
XIANG You-Bing, TAN Wei, ZHAO Kang, WANG Xiao-Jun.
Research on the Stability of Artificial Pillar with Similar Simulation Experiment
[J]. Metal Mine, 2013, 42(06): 31-34.
|