[1] |
CAI Xingqi, DONG Wenming, TAN Qiren, YU Zhi, BI Lin.
Blasting Process Optimization Based on Grade Control Model in Openpit Uranium Mine
[J]. Metal Mine, 2022, 51(07): 105-112.
|
[2] |
Lü Chao, XIE Feng, XIE Lizhi, LI Bo, MA Yuanlin.
Experimental Study on Process Optimization of a High Sulfur Lead-Zinc Mine in the Northeast Yunnan
[J]. Metal Mine, 2021, 50(03): 110-115.
|
[3] |
Chen Keqiang, Yin Wanzhong, Rao Feng, Ma Yingqiang, Wu Jie, Miu Yan.
Effect of Agglomeration through Geopolymerization on the Bioleaching of Low-Grade Copper Ore from High Pressure Grinding Roll
[J]. Metal Mine, 2020, 49(07): 105-110.
|
[4] |
XIAO Peng, WANG Hong-Jun, Ye-Feng-Chun, Yi- Yu, Ji-Hong-Wei, Qiu-Shi-Wei.
Current Status and Prospects of Selenium and Tellurium Recycling Process for Scattered Metals
[J]. Metal Mine, 2020, 49(04): 52-60.
|
[5] |
WANG Zhi-Qing, ZHOU Xiu-Yan, LI Xue-Jie, CHEN Fang, ZHU Hong-Fei, ZHAO Xin.
Progress of the Functional Microorganisms in Bioleaching Studies
[J]. Metal Mine, 2019, 48(11): 125-131.
|
[6] |
ZHOU Hua-Rong, XU Yong-Wei, ZHANG Hui-Ting, WENG Cun-Jian, WANG Peng-Cheng-3, LUO Xian-Ping.
Optimization Research of a Lead-zinc Sulfide Ore Beneficiation Process in Qinghai
[J]. Metal Mine, 2019, 48(07): 103-107.
|
[7] |
ZHU Chuan-Qi, KOU Jue, SUN Fa-Zhao, HUANG Wen-Hao, MA Shu-Xian, SUN Chun-Bao.
Research on Improving the Recovery of Once Alloy in Nickel Matte
[J]. Metal Mine, 2019, 48(03): 95-99.
|
[8] |
南Nan , ZHU Yi-Min, HAN Yue-Xin, CHEN Jin-Xin.
Optimization of Phosphorus Recovery Process on Iron Tailings by New Room Temperature Collector DJX-6
[J]. Metal Mine, 2019, 48(02): 121-124.
|
[9] |
PENG Hui-Qing, HUANG Xin, LUO Wen, SHAO Hui.
Study on Optimization of Flotation Process on a Molybdenum Ore
[J]. Metal Mine, 2019, 48(01): 83-86.
|
[10] |
XU Shou-Xin, YAN Wei-Shan, QI Ze-Wen.
Research on Digital Mining Technology in JISCO Xigou Mine
[J]. Metal Mine, 2018, 47(11): 171-175.
|
[11] |
WANG Xin, LIN Hai, DONG Ying-Bo, LI Gan-Yu.
Effects of the Change of Mineral Phase and Vanadium Speciation on Bioleaching Vanadium from Stone Coal
[J]. Metal Mine, 2018, 47(03): 85-89.
|
[12] |
LIU Jin-Yan, XIN Jing-Jing, YANG Lin-Heng, ZHANG Shui-Long, ZHAN Guang-Hao.
Advances in Bioleaching Technology of Arsenic-bearing Copper Ores
[J]. Metal Mine, 2018, 47(03): 13-18.
|
[13] |
CHENG Hai-Yong, WU Ai-Xiang, LUO Gan-Hua, WANG Yi-Ming.
Mechanics Analysis and Construction Process of Light-weight Retaining Wall for Backfill
[J]. Metal Mine, 2016, 45(09): 58-61.
|
[14] |
CONG Ying.
Optimization of Copper Beneficiation Process for a Refractory Copper Ore in Qinghai
[J]. Metal Mine, 2015, 44(11): 74-77.
|
[15] |
WANG Jin-Qing, YAN Qun, LIANG Chang-Li, LUO Xian-Ping.
Research Progress in Bioleaching of Nickel Sulphide Ore
[J]. Metal Mine, 2015, 44(08): 85-91.
|