[1] |
XU Zhihua, PENG Yuanhang, LIN Jiaxuan, LU Xingzheng, XIA Lin, LIN Rongchuan, LIANG Yanbin.
Development and Application of a Sliding Equipment System Based on Single-pulse
Scanner and Rangefinder for Pile Inventory
[J]. Metal Mine, 2024, 53(5): 144-.
|
[2] |
XIAO Han-Xin, TANG Xue-Fei, LIU Jie, LI Yan-Jun, YANG Guang.
Study on the Crushing and Grinding Process of a Concentrator
[J]. Metal Mine, 2019, 48(02): 168-172.
|
[3] |
ZHANG Rui-Xin, LIU Yu, ZHENG Qun-Fei, SUN Jian-Dong, WU Hai-Long, LIU Wen-Wen.
Simulation Analysis of Influencing Factors of Double-Geared Roller Crusher Crushing Efficiency Based on EDEM
[J]. Metal Mine, 2018, 47(02): 154-159.
|
[4] |
BAI Run-Cai, SONG Qun, LIU Chuang.
Optimization of Key Technology Parameters of Self-mobile Semi-continuous Mining System
[J]. Metal Mine, 2016, 45(12): 170-175.
|
[5] |
WANG Yi-Ming, WANG Jian, LIU Dong, DONG Hong-Yan.
Moving Plan of Semi-mobile Crusher Optimized by Transportation Model of Time and Space
[J]. Metal Mine, 2016, 45(02): 42-46.
|
[6] |
WENG Xing-Yuan, YANG Qi-Fan, LIU Lei, CAO Jin-Cheng.
Effect of Different Broken Way on Grinding Characteristics of Anshan-type Hematite
[J]. Metal Mine, 2015, 44(03): 120-122.
|
[7] |
QIU Jing-Wen, GUO Wen-Zhe, FU Xiao-Rong.
Development Status of Large-scale Hydraulic Gyratory Crusher at Home and Abroad
[J]. Metal Mine, 2013, 42(07): 126-134.
|
[8] |
GU Wei, TAN Zhi-Xiang, DENG Ka-Zhong.
3D Visualization Prediction of Mining Subsidence System Based on the Active X Automation
[J]. Metal Mine, 2013, 42(03): 119-122.
|
[9] |
KUANG Yong, Yang-Cheng-Lin, LI Liang-Jun.
Research on Moving Increment and Period of crusher in Depression Metallic Open Pit
[J]. Metal Mine, 2011, 40(11): 20-21+57.
|
[10] |
YAN Chao-Hong.
Research on rapid design system of PE type Jaw Crusher based on NX
[J]. Metal Mine, 2011, 40(05): 120-122+127.
|
[11] |
HAO Qi-Chang, JI Wan-Jian, SHANG Qi-Wen, SUN Zhen-Bo, WANG Qi.
Research and Development of Crusher Cleaner with Wireless Remote Control
[J]. Metal Mine, 2010, 39(10): 114-119,133.
|
[12] |
YANG Li-Rong, CAI Gai-Pin.
Automatic Control Reformation of Single Cylinder Hydraulic Crusher based on PLC
[J]. Metal Mine, 2010, 39(07): 119-120,131.
|
[13] |
XU Hong-Yu, XU Zhan-Min, AI 尔Ken-·Ai-Hai-Ti, WANG Guo-Bo.
americal Simulation and Optimization for Moving Jaw of BP1100/700 Jaw Crusher
[J]. Metal Mine, 2010, 39(07): 116-118,128.
|
[14] |
LI Jin-Xu, LI Ke-Min, YANG Ming, YANG He.
Application Research of Windproof and Dust Suppressing Wall in Heidaigou Openpit Mine
[J]. Metal Mine, 2010, 39(01): 159-162+166.
|
[15] |
ZHOU Yu-Xin, DUAN Yong.
Automatic Monitoring System of Yunfu Pyrite Tailings Pond
[J]. Metal Mine, 2009, 39(12): 99-102.
|