[1] |
KE Lihua, HUANG Changchang, LI Quanming LI Zhentao YE Yicheng, ZHANG Guangquan, ZHANG Ying, .
Safety Situation Analysis and Sensitive Factors Study of Tailings Pond
[J]. Metal Mine, 2021, 50(11): 165-172.
|
[2] |
ZHAO Haoyang SHI Guangbin, YANG Zhenhong ZHANG Wen.
Study on Rockburst Tendency Prediction Based on Combined Weighting-Improved Set Pair Analysis
[J]. Metal Mine, 2021, 50(05): 71-77.
|
[3] |
GUO Qing-Biao, WANG Liang, 吕Xin , JIANG Chuan-Li.
Stability Evaluation of the Construction Site above a Goaf Based on Cloud Model and Fuzzy Hierarchy Analysis
[J]. Metal Mine, 2019, 48(11): 43-48.
|
[4] |
WANG Jun, LANG Jun-Biao, LI Gang, GAO Qian, ZHANG Jun-Ning.
Dynamic Stability Analysis of Mining-induced Foundation Tailings Reservoir under Fluid-solid Coupling
[J]. Metal Mine, 2019, 48(09): 172-178.
|
[5] |
LI Hong-Liang, WANG Li-Juan, MA Song, YIN Heng, JIA Hu-Jun, JIA Jie-Qiong.
Assessment of Flood Discharge Capacity of Tailings Pond Drainage System in Dissecting Area Based on "Integration of Space, Sky and Ground"
[J]. Metal Mine, 2019, 48(01): 181-186.
|
[6] |
HONG Zhen-Chuan, WANG Guang-Cheng, ZHU Mo-Lin, CHEN Shu-Zhao, HAN Liu.
Safety Evaluation and Treatment Plan after Excavation Damage of Slope Foot in Washan Dump
[J]. Metal Mine, 2018, 47(11): 144-148.
|
[7] |
YUAN Yong-Qiang- .
Discussion on Environmental Anti-seepage Design of Category II Tailing Pond
[J]. Metal Mine, 2016, 45(05): 178-182.
|
[8] |
LIU Yang, QI Qing-Lan, ZHANG Li-Ting.
Study on Evolution of Debris Flow from Dam Break and Protection Measures
[J]. Metal Mine, 2015, 44(12): 139-143.
|
[9] |
吕Zhi-Tao , JIN Xiao-Guang, LI Ya-Yong, WANG Hong-Ke.
Research on Stability of Tailing Pond in Qijiang Iron Mine After Storage capacity Enlarging
[J]. Metal Mine, 2015, 44(03): 183-186.
|
[10] |
SU Jun, ZHANG Da, HAN Zhi-Lei, LI Chun-Feng, LI Peng-Wei.
Lightning Protection Design of Online Monitoring System of Tailing Pond
[J]. Metal Mine, 2013, 42(11): 126-129+134.
|
[11] |
ZHANG Jian-Yong, SU Jian-Jun.
Mining method selection for Third Phase Project of Shirengou Iron Mine
[J]. Metal Mine, 2013, 42(01): 23-26.
|
[12] |
LI Xiao-Lei, WEI Zhong-Yi.
Reclamation Suitability Evaluation of the Tailing Pond in Hongtoushan Copper Mine
[J]. Metal Mine, 2012, 41(12): 111-114+118.
|
[13] |
DAI Yong-Xin.
Discussion on Key Technologies of Tailings Pond Reconstruction from Open Pit
[J]. Metal Mine, 2012, 41(01): 58-62.
|
[14] |
LIU Qi, ZHANG Qin-Li, LIU Jian-Gang, XUE Xi-Long.
Comprehensive Evaluation of Development Schemes Based on SPA and AHP
[J]. Metal Mine, 2011, 40(09): 28-32.
|
[15] |
LI Hui, CHEN Guang-Ping, MA Hai-Tao, WANG Yun-Hai.
Application of 3D Numerical Simulation to Ground Pressure Disaster Assessment for Underground Mine
[J]. Metal Mine, 2011, 40(08): 136-139.
|