[1] |
GE Husheng, GONG Fuhui, SUN Yanyan, KUANG Guoming, PENG Nanzhu, LIANG Chao, HU Jianhua.
Construction and Application of Intelligent System in Open-pit Mine under Dual 5G Network
[J]. Metal Mine, 2022, 51(09): 167-173.
|
[2] |
YIN Wanzhong, TANG Yuan.
Current Status in Study of Genetic Flotation of Minerals
[J]. Metal Mine, 2021, 50(01): 42-54.
|
[3] |
SUN Zhen-Hua, Yang-Tian-Hong, An- Qi, Xin-Quan-Ming- .
Back Analysis Method of Geotechnical Parameters based on IAGA+M-SVR and Its Application
[J]. Metal Mine, 2020, 49(04): 32-38.
|
[4] |
YAN Zhi-Kun, ZHONG Qi-Ming, BIAN Shi-Hai, MEI Shi-Ang.
Research Progress on Filter Design of Tailing Dam Drainage System
[J]. Metal Mine, 2018, 47(04): 18-26.
|
[5] |
LIU Xiao-Sheng, YU Liang, FENG Teng-Fei.
Slope Displacement Prediction Based on SVR Forecast Combination Model
[J]. Metal Mine, 2018, 47(02): 184-187.
|
[6] |
TIAN Feng-Liang, SUN Xiao-Yu, ZHANG Hang- .
A Mining and Analyzing Method of Truck Fault in Open-pit Mine Based on NLP Technology
[J]. Metal Mine, 2017, 46(07): 138-142.
|
[7] |
YU Ji-Wu, XING Yuan-Xiu.
Design of the Vision Monitoring System for Security of Mineshaft Based on Internet of Things
[J]. Metal Mine, 2015, 44(07): 107-110.
|
[8] |
TIAN Zhi-Yong, HUANG Zhong-Hui.
Data Acquisition System for Mine Environment Based on CP1E and Mine Transmitter
[J]. Metal Mine, 2015, 44(03): 152-155.
|
[9] |
YU De-Yun, 吕Shu-Ran , QIN Hua.
Effect of Blasting Vibration on Primal Dam of Upstream Tailing Reservoir
[J]. Metal Mine, 2014, 43(01): 38-42.
|
[10] |
DUAN Wei-Ping, GUO Jin-Feng, WANG Bin.
Stacking Process of Metal Mine Tailings in China and its Development Trend
[J]. Metal Mine, 2013, 42(12): 118-122.
|
[11] |
TAN Xing-Long-1, ZHAO Xiao-Qing, ZHANG Yu-Hua, HU Hong.
Application of GA-SVR Algorithm to GPS Elevation Fitting
[J]. Metal Mine, 2013, 42(08): 88-91.
|
[12] |
ZHOU Zhen-Min, LI Xiang-Yuan.
The Cause of Tailings Dam Accident and Ecological Environmental Impact Assessment in China
[J]. Metal Mine, 2012, 41(11): 121-124.
|
[13] |
LUO Dong-Lan, HU Hu.
Casing Pipe Plugging Method of Flood Discharging Tunnel in Tailing Dam
[J]. Metal Mine, 2012, 41(09): 143-145.
|
[14] |
ZHANG Jin, LE Tao, CAO Ji-Gang.
Dynamic Liquefaction Analysis of Toushishan Tailing Dam
[J]. Metal Mine, 2012, 41(06): 13-15+18.
|
[15] |
WEI Yong, XU Kai-Li.
Research on Mechanism and Process of Tailing Dam Break due to Overtopping
[J]. Metal Mine, 2012, 41(04): 131-135.
|