欢迎访问《金属矿山》杂志官方网站,今天是 分享到:

金属矿山 ›› 2009, Vol. 39 ›› Issue (02): 27-29+39.

• 采矿工程 • 上一篇    下一篇

冬瓜山花树坡矿床-580 m以下中段开采方案探讨

段宗银1,施发伍2,张良贵2   

  1. 1.铜陵学院;2.安徽铜都铜业冬瓜山铜矿
  • 出版日期:2009-02-16 发布日期:2012-02-02

Mining Plan for Levels below -580 m in Huashupo Deposit in Dongguashan Copper Mine

Duan Zongyin1,Shi Fawu2,Zhang Lianggui2   

  1. 1.Tongling University;2.Dongguashan Copper Mine, Anhui Tongdu Copper
  • Online:2009-02-16 Published:2012-02-02

摘要: 为使花树坡矿床-580 m中段以下持续深入、安全高效的回采,在类比法和冬瓜山铜矿老区40多a开采成功经验的基础上, 综合考虑经济性、系统性、适应性和灵活性,选择中深孔或大孔落矿、有轨运输、人工矿柱盘区空场嗣后充填采矿法开采新工艺。

关键词: 地下矿床, 开采方案, 人工矿柱盘区空场嗣后充填采矿法

Abstract: To ensure a sustained safe and efficient mining of the levels below -580m in Huashupo deposit, based on the analogy method and more than 40 years' successful experience in mining in Dongguashan old mine area, and in a comprehensive consideration of economy, systematicness, adaptability and suitability, a new mining process is chosen, which adopts medium or long hole blasting, track transportation, artificial pillar supported panel, and open-stop with delayed filling.

Key words: Underground deposit, Mining plan, Open stoping with delayed filling in artificial pillar panel