摘要: 根据庙沟铁矿2008年末选厂生产能力由原122万t/a提高到190万t/a的新变化,深入分析庙沟铁矿矿山开采现状,指出庙沟铁矿采矿现有开拓系统年采出矿石154万t的生产能力已远不能适应选厂新增生产能力需要,在此基础上从东边帮靠帮斜坡道的开拓、永久性运矿路的开拓、0线以南上下盘开拓方式等的选择和东排土场改造4个方面提出开拓系统优化设计方案,叙述方案实施简况,并提出开拓系统优化的预期经济效果。
关键词: 开拓系统优化, 设计方案, 节约成本
Abstract: The production capacity of the concentrator of Miaogou Iron Mine was increased from original 1.22 million t/a to the current 1.90 million t/a at the end of 2008. In view of this, the mining status of Miaogou mine is analyzed in depth. It is pointed out that the 1.54 million t/a mining capacity of the current development system is far from meeting the need of the newly added capacity of the concentrator. A plan for optimizing the development system is proposed from four aspects, the development of the ramp from the east wall, the development of permanent ore-transport road, the selection of the development mode for the hanging wall and footwall south of Line 0 and the transformation of the east dumping site. The implementation and the expected economic results of this optimization plan are described briefly.
Key words: Optimization of development system, Design plan, Cost reduction
张子祥, 许雁超. 庙沟铁矿开拓系统的优化[J]. 金属矿山, 2009, 39(05): 40-42.
ZHANG Zi-Xiang, XU Yan-Chao. Optimization of the Development System in Miaogou Iron Mine[J]. Metal Mine, 2009, 39(05): 40-42.