欢迎访问《金属矿山》杂志官方网站,今天是 分享到:

金属矿山 ›› 2009, Vol. 39 ›› Issue (07): 36-38.

• 采矿工程 • 上一篇    下一篇

一种大直径深孔侧向崩矿新方案

杨晓雷1,刘让2   

  1. 1.昆明理工大学;2.大红山铜矿
  • 出版日期:2009-07-15 发布日期:2011-04-26

A New Approach of Large-Diameter Long-Hole Side Caving

Yang Xiaolei1,Liu Rang2   

  1. 1.Kunming University of Science and Technology;2.Dahongshan Copper Mine
  • Online:2009-07-15 Published:2011-04-26

摘要: 根据矿床赋存条件及围岩性质,提出了一种大直径深孔侧向崩矿新方案, 不单独拉底,用延伸大孔的办法同时崩落矿房与形成平底结构。探讨该方案的采场要素及工艺过程,给出了炸药单耗及试验中所用的装药及联线方式。最终从本次试验中得到了一些有实用价值的结果。

关键词: 大直径深孔侧向崩矿, 装药结构, 拉底

Abstract: Considering the deposit occurrence and wallrock properties, a new approach of large-diameter long-hole side caving is proposed, in which undercut is not made independently but formed by the extension of large diameter holes, which enables the stope room caving and the formation of flat bottom structure.The stope elements and process of this approach are discussed and the unit explosive consumption and the explosive charging and wire connecting mode in the test are described.Some valuable results are gained from the test.

Key words: Large-diameter long-hole side caving, Charge structure, Undercut