金属矿山 ›› 2012, Vol. 41 ›› Issue (08): 103-105.
• 机电与自动化 • 上一篇 下一篇
孙海军,赵爱明,纪建平,张芸
出版日期:
发布日期:
Sun Haijun,Zhao Aiming,Ji Jianping,Zhang Yun
Online:
Published:
摘要: 矿井提升是矿井生产过程中的一个重要环节,制动系统是提升过程中安全的保障。通过对杏山铁矿主井提升采用的西马格公司生产的液压盘式制动系统的研究,详细介绍了该制动系统的工作原理,对ST3-D型液压站及其主要阀的工作流程进行了深入的分析。
关键词: ST3-D液压站, 盘形制动器, 矿井提升, 阀
Abstract: Mine promotion is an important key in the process of production, and braking system is the safeguard in the process of promotion.Based on the study of hydraulic disc brake system produced in West Magnitogorsk used in Xingshan mine main shaft, the working principle of the brake system was introduced in detail, and ST3- D hydraulic station and its working process of the main valve was analyses deeply.
Key words: ST3-D hydraulic station, Disc brakes, Mine promotion, Valve
孙海军, 赵爱明, 纪建平, 张芸. ST3-D型液压站在矿井提升制动系统中的应用[J]. 金属矿山, 2012, 41(08): 103-105.
SUN Hai-Jun, ZHAO Ai-Ming, JI Jian-Ping, ZHANG Yun. Application of ST3- D Hydraulic Pressure Station in the Mine Promotion Braking System[J]. Metal Mine, 2012, 41(08): 103-105.
/ 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.jsks.net.cn/CN/
http://www.jsks.net.cn/CN/Y2012/V41/I08/103