马坑铁矿一期东区空区处理方案探讨

夏道明   

  1. 福建马坑矿业股份有限公司
  • 出版日期:2012-10-15 发布日期:2012-11-08

Treatment Scheme of Goaf in Eastern Area of Period-I in Makeng Iron Mine

Xia Daoming   

  1. Fujian Makeng Mining Co., Ltd.
  • Online:2012-10-15 Published:2012-11-08

摘要: 马坑铁矿一期东区采用空场采矿法,浅眼落矿,空区暴露总面积为2.83万m2,总体积为74.7万m3。根据已形成的空区特点及废渣回填部分空区、封闭处理空区的成功经验,就马坑铁矿矿山采用“充填”、“封闭”相结合的空区处理方法进行探讨。

关键词: 铁矿, 采空区处理, 充填, 封闭

Abstract: Eastern area of Period-I in Makeng iron mine adopted the open stoping mining method, and the total area of the goafs covers 28 300 m2, and the total volume reaches 747 000 m3.Based on characteristic of goafs and successful experience of closing down goafs and waste filling in eastern area of Period-I in Makeng iron mine, the penman discussed the handling way of goafs of combining filling and closing down which used in Makeng iron mine.

Key words: Iron mine, Goaf treatment, Filling, Closing down