欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2013, Vol. 42 ›› Issue (10): 8-11.

• 采矿工程 • 上一篇    下一篇

综放开采不同采放比的采场矿压特征

王金安,高治国,王利,刘腾   

  1. 北京科技大学土木与环境工程学院
  • 出版日期:2013-10-15 发布日期:2014-01-02

Study on Mine Pressure Behavior under Different Mining-Caving Ratio with Fully-mechanized Mining

Wang Jin'an,Gao Zhiguo,Wang Li,Liu Teng   

  1. Civil and Environmental Engineering School,University of Science and Technology Beijing
  • Online:2013-10-15 Published:2014-01-02

摘要: 以甘肃省华亭矿区为研究对象,通过离散元UDEC数值模拟建立7种不同采放比工况,针对优化采放比、适当提高综放工作面回采率后安全回采的可行性问题进行研究,得出采放比为1∶2.5的工况为最优方案,提高回采率的同时保证了安全回采的可行性,为相似煤层综放工作面合理采放比的确定提供了一定依据。

关键词: 综放工作面, 采放比, UDEC离散元

Abstract: Taking Huating Mining Area in Gansu Province as the research object,the mode under seven different mining-caving ratios is set up with UDEC discrete element method to study the feasibility for safety mining under the optimized mining-caving ratio and the improved mining recovery.It is concluded that the mining-caving ratio of 1∶2.5 is optimal,and it is feasible for the safety mining as the recovery is improved.It provides a certain basis for determining a reasonable mining-caving ratio for similar fully-mechanized caving faces.

Key words: Fully-mechanized caving face, Mining and caving ratio, UDEC Discrete element method