欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2025, Vol. 54 ›› Issue (11): 224-232.

• 安全与环保 • 上一篇    下一篇

竖向及水平地震作用下尾矿库动力响应及液化稳定性分析

刘佳浩1 刘红岩1 邹宗山2 王光兵2 和铁柱2 张光雄2   

  1. 1.中国地质大学(北京)工程技术学院,北京 100083;2.保利民爆哈密有限公司,新疆 哈密 839000
  • 出版日期:2025-11-15 发布日期:2025-12-02
  • 通讯作者: 刘红岩(1975—),男,教授,博士,博士研究生导师。
  • 作者简介:刘佳浩(1999—),男,硕士研究生。
  • 基金资助:
    “十三五”国家重点研发计划项目(编号:2019YFC1509701);北京市自然科学基金项目(编号:8222031);新疆维吾尔自治区哈密市巴 里坤县科技计划项目(编号:blkkj23-01)。

Dynamic Response and Liquefaction Stability Analysis of Tailings Pond under Vertical and Horizontal Earthquake

 LIU Jiahao1 LIU Hongyan1 ZOU Zongshan2 WANG Guangbing2 HE Tiezhu2 ZHANG Guangxiong2   

  1. 1.School of Engineering and Technology,China University of Geosciences (Beijing),Beijing 100083,China; 2.Poly Explosive Hami Co.,Ltd.,Hami 839000,China
  • Online:2025-11-15 Published:2025-12-02

摘要: 地震作用下尾矿库的动力响应及稳定性分析是尾矿库安全评价的一项重要内容,而目前研究大多仅考 虑了水平向地震作用,这对于一、二等尾矿库来说是偏于危险的,且不满足国家规范相关要求。为此,以某二等尾矿库 为例,首先采用Geo-studio软件中SEEP/W和SIGAM/W模块考虑流固耦合作用,分析尾矿坝在正常水位和洪水位条 件下的渗流场和应力场;然后采用QUAKE/W模块对该尾矿坝在水平和竖向地震共同作用下的动力响应及震动液化 现象进行了深入研究;最后基于SLOPE/W模块中极限平衡法对不同工况条件下的尾矿坝稳定性进行了分析计算。 结果表明:① 洪水位条件下坝体内部的浸润线埋深虽有所抬升,但仍满足规范要求;尾矿坝最大水平位移集中在坝坡 中部,最大竖直位移则集中在堆积坝顶部;② 在地震作用下,尾矿坝会出现“鞭梢效应”“延后效应”和“高程效应”;单 向地震波作用下的尾矿库液化区域均小于相应的双向地震波作用下的尾矿库液化区域,且水平向地震波对液化影响 较大,这说明同时考虑水平及竖向地震的共同作用十分必要;③ 尾矿坝稳定性的极限平衡分析结果表明,其稳定性系 数均满足规范要求,尾矿坝整体稳定。

关键词: 尾矿库 Geo-studio软件 双向地震波 液化 稳定性

Abstract: The dynamic response and stability analysis of tailings pond under earthquake is an important part of the safety evaluation of tailings pond,but most of the current studies only consider the horizontal seismic action,which is dangerous for first-class and second-class tailings pond and does not meet the requirements of national norms.For this reason,taking a sec ond-class tailings pond as an example,the seepage field and stress field of tail-ings pond under normal water level and flood water level are analyzed by using SEEP/W and SIGAM/W modules in Geo-studio software to consider fluid-solid coupling. Then,the dynamic response and vibration liquefaction of the tailings pond under the combined action of horizontal and vertical earthquakes are studied by using QUAKE/W module.Finally,the stability of tailings dam under different working conditions is analyzed and calculated based on the limit equilibrium method in SLOPE/W module.The results show that:① Although the buried depth of the infiltration line in the dam body rises under the condition of flood water level,it still meets the requirements of the code;the maximum horizontal displacement of the tailings dam is concentrated in the middle of the dam slope,while the maximum vertical displacement is concentrated on the top of the accumulation dam.② Under the action of earthquake,the tail ing dam will have "whiplash effect","delayed effect" and "elevation effect",and the liquefaction area of tailings pond under the action of unidirectional seismic wave is smaller than that under the action of corresponding bidirectional seismic waves,and the horizontal seismic wave has a great influence on liquefaction,which shows that it is necessary to consider the joint action of horizontal and vertical earthquakes at the same time.③ The limit equilibrium analysis results of the stability of the tailings damshowthat thestabilitycoefficientsmeet therequirementsof thecode,andthetailingsdamisstableasawhole.

Key words: tailingspond,Geo-studiosoftware,bidirectional earthquakewaves,liquefaction,stability