金属矿山 ›› 2026, Vol. 55 ›› Issue (2): 121-127.

• 矿物工程 • 上一篇    下一篇

新疆某难选硅孔雀石矿浸出-置换工艺研究

苗 梁1 弥晓红2 罗 刚3 杨慧杰4 侯 凯4   

  1. 1. 西北矿冶研究院,甘肃 白银 730900;2. 白银有色集团股份有限公司,甘肃 白银 730900;
    3. 新疆白银矿业开发有限公司,新疆 阿勒泰 836500;4. 太原理工大学矿业工程学院,山西 太原 030024
  • 出版日期:2026-02-15 发布日期:2026-03-03
  • 通讯作者: 罗 刚(1987—),男,工程师。
  • 作者简介:苗 梁(1986—),男,高级工程师。
  • 基金资助:
    山西省重点实验室建设项目(编号:202104010910021)。

Study on the Leaching-Replacement Process for a Refractory Chrysocolla Ore from Xinjiang

MIAO Liang1 MI Xiaohong2 LUO Gang3 YANG Huijie4 HOU Kai4   

  1. 1. Northwest Research Institute of Mining and Metallurgy,Baiyin 730900,China;2. Baiyin Nonferrous Group Co. ,Ltd. ,
    Baiyin 730900,China;3. Xinjiang Silver Mining Industry Development Co. ,Ltd. ,Altay 836500,China;
    4. College of Mining Engineering,Taiyuan University of Technology,Taiyuan 030024,China
  • Online:2026-02-15 Published:2026-03-03

摘要: 为高效开发新疆某典型难选硅孔雀石矿资源,本研究在评估硫化浮选效果不佳的基础上,确定了浸
出—置换—沉淀的适宜工艺路线。研究系统考察了给矿粒度、酸浓度、酸矿比、浸出周期与温度等关键参数对铜浸出
率的影响,并优化了浸出液的置换条件。结果表明,在室温条件下,最佳柱浸参数为:给矿粒度30~ 3 mm、硫酸浓度
10%、酸矿比100 kg/ t、浸出周期40 d,此时铜浸出率达85. 61%。针对新疆地区气候特点,模拟夏季地表高温环境的试
验表明,浸出周期可缩短至20 d。对于所得浸出液,在铁屑用量为理论值2. 0 倍、置换6 h 的条件下,作业置换率超过
96%,可获得品位高于95%的海绵铜,且置换余液中Cu2+浓度降至0. 048 g/ L,证实了铜的高效回收。本研究为该类难
选氧化铜矿的资源化利用提供了可靠的技术依据。

关键词: 氧化铜矿 硅孔雀石 柱浸 置换 工艺优化

Abstract: To efficiently exploit a typical refractory chrysocolla ore resource from Xinjiang,this study established a combined
leaching-replacement-precipitation process as the suitable route after evaluating the poor performance of sulfide flotation.
The research systematically investigated the effects of key parameters,including feed particle size,acid concentration,acid-toore
ratio,leaching cycle,and temperature on copper leaching efficiency,and optimized the replacement conditions for the leach
solution. The results showed that under room temperature,the optimal column leaching parameters were:feed size of 30~3 mm,
sulfuric acid concentration of 10%,acid consumption of 100 kg/ t,and a leaching cycle of 40 days,achieving a copper leaching
rate of 85. 61%. Simulated high-temperature experiments,considering the climate in Xinjiang,demonstrated that the leaching
cycle could be shortened to 20 days in summer. For the obtained leach solution,under the conditions of iron filings dosage at
twice the theoretical amount and a replacement time of 6 h,the operational replacement efficiency exceeded 96%,producing
sponge copper with a grade higher than 95%. The Cu2+ concentration in the residual solution after replacement dropped to
0. 048 g/ L,confirming highly efficient copper recovery. This work provides a reliable technical reference for the resource utilization
of this type of refractory copper oxide ore.

Key words: copper oxide ore,chrysocolla,column leaching,replacement,process optimization