欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2026, Vol. 55 ›› Issue (6): 171-176.

• 矿物工程 • 上一篇    下一篇

某高碳型铅锌矿脱碳预处理与浮选工艺优化研究

余 力1,2 伏帛川1 邓 攀3 高冲军3 杨 洋1 邹 敏1,2 刘长林1 张 浩1,2   

  1. 1.西昌学院理学院,四川 西昌 615000;2.甘洛县尔呷地吉铅锌矿业公司,四川 甘洛 616850; 3.西昌学院州校共建攀西战略资源创新开发重点实验室,四川 西昌 615000
  • 出版日期:2026-07-15 发布日期:2026-07-15
  • 作者简介:余 力(1994—),男,副教授,博士,硕士研究生导师。
  • 基金资助:
    攀西战略资源综合利用实验室开放基金项目(编号:XCU-PX0401);凉山州科技计划项目(编号:24YYYJ0014,25YYYJ0044)。

Study on Decarburization Pretreatment and Flotation Process Optimization of A High-Carbon Lead-Zinc Ore

YU Li1,2 FU Bochuan1 DENG Pan3 GAO Chongjun3 YANG Yang1 ZOU Min1,2    LIU Changlin1 ZHANG Hao1,2   

  1. 1.College of Science,Xichang University,Xichang 615000,China;2.Ganluo County Ergadiji Lead Zinc Mining Company, Ganluo 616850,China;3.Liangshan Prefecture-Xichang University Key Laboratory of Panxi Strategic Resource Innovation and Development,Xichang 615000,China
  • Online:2026-07-15 Published:2026-07-15

摘要: 四川甘洛某高碳型铅锌矿含铅2.45%、含锌4.65%,氧化率为10%~30%,属于混合型铅锌矿。原矿中 有机碳含量较高,易对浮选药剂产生非选择性吸附,导致现场浮选工艺药剂用量大、精矿铅锌互含严重。为优化选别 效果,本研究在铅浮选作业前增加脱碳作业,采用煤油与柴油(质量比1∶1)作为脱碳捕收剂,并通过条件试验优化铅 锌浮选药剂制度。采用与现场流程一致的1粗4精4扫、中矿顺序返回流程选铅,1粗4精5扫、中矿顺序返回流程选 锌基础上,引入脱碳作业后,获得了铅品位51.22%、铅回收率88.85%的铅精矿,锌品位51.17%、锌回收率71.22%的 锌精矿。与未脱碳工艺相比,精矿中铅锌互含现象显著降低,选别指标改善明显。

关键词: 浮选 , 高碳 , 铅锌矿 , 脱碳 , 工艺优化

Abstract: A high-carbon lead-zinc ore in Ganluo,Sichuan,contains Pb of 2.45% and Zn of 4.65%,with an oxidation rate ranging from 10% to 30%,belonging to mixed lead-zinc ore.The ore has a high organic carbon content,which tends to cause non-selective adsorption of flotation reagents,resulting in high reagent consumption and severe Pb-Zn mutual content in the existing flotation process.To improve the separation performance,a decarburization stage was introduced prior to lead flota tion,using a mixture of kerosene and diesel (mass ratio 1∶1) as the decarburization collector,followed by optimization of the reagent regime through conditional tests.Based on the original closed-circuit flotation process of "one roughing,four cleaning, four scavenging with middlings return" for lead and "one roughing,four cleaning,five scavenging with middlings return" for zinc,the decarburization stage significantly reduced the mutual content of lead and zinc in the concentrates.The lead concen trate with a Pb grade of 51.22% and Pb recovery of 88.85%,and the zinc concentrate with a Zn grade of 51.17% and Zn re covery of 71.22% were obtained.Compared with the process without decarburization,the mutual content of lead and zinc in the concentrates was significantly reduced,and the separation indexes were notably improved.

Key words: flotation,high carbon,lead-zinc ore,decarburization,process optimization

中图分类号: