欢迎访问《金属矿山》杂志官方网站,今天是 分享到:
×

扫码分享

金属矿山 ›› 2026, Vol. 55 ›› Issue (8): 49-.

• 采矿工程 • 上一篇    下一篇

考虑动态需求耦合风险偏好的采矿生产月计划调整优化方法

王敬博1 黄 敏1 王 庆1 李欣峰2 姜昭晖3 姚 磊3   

  1. 1.东北大学信息科学与工程学院,辽宁 沈阳 110000;2.长春黄金设计院有限公司,吉林 长春 130000; 3.中国黄金集团内蒙古矿业有限公司,内蒙古 呼伦贝尔 021000
  • 出版日期:2026-08-15 发布日期:2026-09-04
  • 通讯作者: 黄 敏(1968—),女,教授,博士,博士研究生导师。
  • 作者简介:王敬博(2002—),男,硕士研究生。通
  • 基金资助:
    国家自然科学基金重大研究计划集成项目(编号:92567302);国家自然科学基金重点项目(编号:U25A20431,62432003);中央高校基 本科研业务费专项(编号:N25ZLV008);辽宁省“兴辽英才计划”项目(编号:XLYC2202045)。

Optimization Method of Mining Production Monthly Plan Adjustment Considering Dynamic Demand Coupling Risk Preference

WANG Jingbo1 HUANG Min1 WANG Qing1 LI Xinfeng2 JIANG Zhaohui3 YAO Lei3   

  1. 1.College of Information Science and Engineering,Northeastern University,Shenyang 110000,China; 2.Changchun Gold Design Institute Co.,Ltd.,Changchun 130000,China; 3.Inner Mongolia Mining Co.,Ltd.,China National Gold Group,Hulunbuir 021000,China
  • Online:2026-08-15 Published:2026-09-04

摘要: 矿山企业在面对大宗商品市场动态需求波动时,存在静态采矿生产计划难以匹配多变市场需求,导致 资源配置效率低与经营风险高的问题。提出一种基于“预测—生成—评估”一体化框架的月计划调整优化方法。首 先,构建隐马尔可夫模型(HMM)挖掘期货交易数据的时序特征,辨识市场需求的潜隐状态(高/中/低);其次,建立动 态需求与风险偏好耦合的计划生成模型,引入不同等级的高斯扰动模拟决策者的风险偏好(进取/中立/保守),并结 合矿山工艺约束生成差异化的备选计划集;最后,构建DEA-AHP综合评估体系,量化客观生产效率并融入不同市场 状态下的管理策略权重,实现最优方案筛选。基于某矿山企业实际采矿生产数据的仿真测试显示,该方法生成的优 化计划在全部9种测试场景下综合效用评分均优于原计划,平均提升幅度约0.94%,有效解决了生产决策与动态需求 脱节的难题,为动态市场环境下的科学决策提供了理论支持。

关键词: 采矿生产 , 市场需求波动 , 月计划 , HMM , 风险偏好耦合

Abstract: In the face of dynamic demand fluctuations in the commodity market,the existing static mining production plan is difficult to match the changing market demand,resulting in low resource allocation efficiency and high operational risk.A monthly plan adjustment and optimization method based on the "prediction-generation-evaluation" integrated framework is pro posed.Firstly,a hidden Markov model (HMM) is constructed to mine the time series characteristics of futures trading data and identify the hidden state (high/medium/low) of market demand.Secondly,a plan generation model coupled with dynamic de mand and risk preference is established.Different levels of Gaussian disturbance are introduced to simulate the risk preference of decision makers (aggressive/neutral/conservative),and a differentiated alternative plan set is generated in combination with mine process constraints.Finally,the DEA-AHP comprehensive evaluation system is constructed to quantify the objective pro duction efficiency and integrate the management strategy weights under different market conditions to achieve the optimal solu tion screening.The simulation test based on the actual mining production data of a mining enterprise shows that the comprehen sive utility score of the optimization plan generated by this method is better than the original plan in all 9 test scenarios,with an average increase of about 0.94%.It effectively solves the problem of disconnection between production decision and dynamic demand,and provides theoretical support for scientific decision-making in dynamic market environment.

中图分类号: