Application of Curtain Grouting Method in Dongguashan Copper Mine

Wang Lisheng   

  1. Tongling Zhongdu Nonferrous Metal Mine Construction Co.
  • Online:2008-03-15 Published:2011-07-21

Abstract: Dongguashan suffered a water rush-in accident with the maximum rush-in water rate of 500m3/h due to the disclosure of a water-containing fractured belt in drilling a return airway. Curtain grouting method was adopted in passing the fractured belt, with eight curtain holes, 756.6m advance, grouting volume of 131.646m3 and three months' construction period. After the construction, the residual water sprinkling rate is only 2 m3/ h, fully satisfying the design requirement.