[1] |
HAN Housheng, LI Yubiao, PAN Mengzhen, CHEN Kun, ZHANG Yuan, GU Yunxiang, XUE Lutao, JIAN Shouwei.
Experimental Study on Preparation of Lightweight Foamed Concrete by Low Silicon Iron Tailings
[J]. Metal Mine, 2024, 53(4): 269-.
|
[2] |
XIONG Xiaoyuan, TIAN Yuqing, ZHOU Jiabin.
Study on the Preparation of High Performance Concrete with Extra-fine Iron Tailing Powder
as Mineral Admixture
[J]. Metal Mine, 2024, 53(3): 290-.
|
[3] |
WAN He ZHANG Jinyan QU Juanping ZHANG Chonghui XUE Jiwei WANG Sen BU Xianzhong.
Intelligent Recognition Model of Mineral Based on Improved MobileNet V3
[J]. Metal Mine, 2024, 53(01): 174-181.
|
[4] |
LI Jiaping, HOU Jie LI Guoqing ZHAO Wei SHENG Baoli.
A New Standard-oriented Three-dimensional Mine Resource Reserve Evaluation System
[J]. Metal Mine, 2024, 53(01): 109-115.
|
[5] |
GUO Guangjun LI Guoqing LI Jiaping WANG Jiangang YU Qianqian ZHAO Wei SHENG Baoli.
Development and Application of a New Standard-oriented Mine Resource Reserve Management System
[J]. Metal Mine, 2024, 53(01): 90-98.
|
[6] |
LIU Xinxin SHENG Mingqiang AI Luoyan YAN Qin.
Classification Damming Process and Design Method for High Concentration Tailings
[J]. Metal Mine, 2023, 52(09): 199-205.
|
[7] |
ZHANG Caie, SHI Jihong, ZHANG Mingyu, SUN Yicheng, PAN Chengyao, LU Shuaishuai.
Effects of Underflow Orifice Diameter on Density Effect During Classification Process of Multi-component Iron Ore
[J]. Metal Mine, 2023, 52(07): 242-247.
|
[8] |
NI Bin, ZHANG Wei, LIU Xiaoming, WANG Zhao.
Identification Method of Microseismic Signal and Blasting Signal Based on Improved Energy Extremum Approach
[J]. Metal Mine, 2023, 52(07): 185-191.
|
[9] |
LIU Hailin, LI Pengcheng, WANG Yubo.
Delineation of Safety Pillars and Overlying Resource Recovery Technique in Combined Type Shafts of Hard Rock Deposits
[J]. Metal Mine, 2023, 52(07): 168-175.
|
[10] |
ZHANG Laihong, QIN Tingting, ZEREN Zhuoge, ZHANG Haitao, SHE Changchao, LI Jun, ZHANG Chengye.
Land Use Classification of Xilinhot Open-pit Mining Area Based on GEE and Multi-dimensional Features in Recent 30 Years
[J]. Metal Mine, 2023, 52(03): 234-241.
|
[11] |
YANG Yunping, REN Zijie, GAO Huimin, WANG Kang, LI Jiande.
Treatment of Lead-containing Sewage with Calcium Silicate Board Waste and Soil Test
[J]. Metal Mine, 2023, 52(01): 296-300.
|
[12] |
PENG Shangquan LIU Jian WEI Yuhong ZHANG Conghua XIAO Jiajun YAN Wenbin.
Study on the Process of Preparing Manganese Tetroxide with Electrolytic Manganese Anode Slag by Sulfuric Acid Curing and Sulfur Reducing
[J]. Metal Mine, 2023, 52(01): 233-238.
|
[13] |
JIA Zhuping, ZHENG Lujing, HU Yafei, ZHENG Lulin, RONG Peng.
Research and Application of Filling Technology with Glue Powder and Graded Tailing in Jinfeng Gold Mine,Guizhou Province
[J]. Metal Mine, 2022, 51(09): 43-48.
|
[14] |
YANG Jiguang, WU Zaihai, KOU Yunpeng, WANG Zengjia, SONG Zepu, JING Xiaodong, ZHU Gengjie.
Experimental Study on Static Settlement and Semi Industrial Thickening of Two-stage Classification Ultrafine Tailings in A Gold Mine
[J]. Metal Mine, 2022, 51(09): 37-42.
|
[15] |
YE Haiwang, LI Xingwang, YUAN Erjun, LEI Tao.
Blasting Powder Rate Control Technique in Aggregate Mines
[J]. Metal Mine, 2022, 51(07): 80-88.
|