[1] |
XU Zhihua, PENG Yuanhang, LIN Jiaxuan, LU Xingzheng, XIA Lin, LIN Rongchuan, LIANG Yanbin.
Development and Application of a Sliding Equipment System Based on Single-pulse
Scanner and Rangefinder for Pile Inventory
[J]. Metal Mine, 2024, 53(5): 144-.
|
[2] |
SHAO Anlin LIU Chang, YUE Xingtong, WANG Huaiyuan, ZHANG Xingfan, WANG Liancheng.
Path of High-quality Development of China′s Mineral Resources Industry in the New Era
[J]. Metal Mine, 2024, 53(01): 2-6.
|
[3] |
MIAO Zuohua, TANG Yang, REN Lei, WANG Mengting, XIE Yuan, ZHAN Chuan, LI Hongliang.
Study on Mine Video Monitoring Technology Based on 3D Video Fusion
[J]. Metal Mine, 2023, 52(09): 173-179.
|
[4] |
ZHANG Bingbing, LI Pingfeng, XIE Shoudong, CHEN Guangmu, CHEN Jingjing, HUANG Dongxing.
Analysis of Muckpile Shape in Open-pit Mine Based on UAV Aerial Survey Technique
[J]. Metal Mine, 2022, 51(09): 161-166.
|
[5] |
SONG Peng, Xu- Hui, Fan-Xue-Feng, Shu-Xian-Liang- .
Framework Implementation and Key Technologies of MES System for Mining-Beneficiation in Metal Mines
[J]. Metal Mine, 2020, 49(04): 135-141.
|
[6] |
CHEN Jing-He.
Innovation and Practice of the “Five-process Integration” Engineering Management Mode in the Development of Mines Like Zijinshan Gold and Copper Mine
[J]. Metal Mine, 2019, 48(08): 1-6.
|
[7] |
HUANG Qing-Qing, YANG Tian-Hong, YU Qing-Lei, ZHANG Peng-Hai, LIU Hong-Lei.
Research on 3D Visualization and Cloud Data Transmission of Open-pit Iron Ore Based on Unity 3D Platform
[J]. Metal Mine, 2019, 48(04): 138-141.
|
[8] |
LI Hong-Liang, WANG Li-Juan, MA Song, YIN Heng, JIA Hu-Jun, JIA Jie-Qiong.
Assessment of Flood Discharge Capacity of Tailings Pond Drainage System in Dissecting Area Based on "Integration of Space, Sky and Ground"
[J]. Metal Mine, 2019, 48(01): 181-186.
|
[9] |
ZHU Long-Ji, WANG Qi.
The Integrated Circuit of Hybrid Charging and Drive System for a Type of Mine Motor Vehicle
[J]. Metal Mine, 2018, 47(11): 161-165.
|
[10] |
FENG Zhi-Dong, LI Xiong-Huai, LU Liu-Wei.
Using Data Agents Synchronization Method to Realize the Integration of the Old Business Systems of Mine
[J]. Metal Mine, 2018, 47(01): 156-160.
|
[11] |
GAO Xu-Guang, LIU Hui.
Dynamic Evolution Prediction of Surface Subsidence Ponding Caused by Multi-layers Coal Mining in the High Groundwater Level Area
[J]. Metal Mine, 2017, 46(10): 39-42.
|
[12] |
XU Hong-Liang, JIANG Ren-Yi.
Key Technology and Design Practice of Integration of Underground Mining and Beneficiation Engineering
[J]. Metal Mine, 2016, 45(10): 50-53.
|
[13] |
WANG Jing-Yu, ZHANG Ke, HU Yan-Dong, ZHOU Wei.
Overview on High Pressure Grinding Roll-Dry Classification-Low Intenity Magnetic Separation Integration System Technology
[J]. Metal Mine, 2016, 45(06): 101-106.
|
[14] |
LIU Ya-Jing, Yao-Ji-Ming, RAN Wei-Wei.
Design and Realization of GIS System for Mining Method Selection of Metal Mine
[J]. Metal Mine, 2016, 45(03): 119-123.
|
[15] |
ZHANG Peng, GAO Yu-Shan, TAO Zhi-Gang, CHEN Zhuang.
Landslide Disaster Risk Evaluation and Dynamic-Informational Risk Zoning of Open-pit High Slope
[J]. Metal Mine, 2016, 45(01): 166-170.
|