[1] |
XU Zhihua, PENG Yuanhang, LIN Jiaxuan, LU Xingzheng, XIA Lin, LIN Rongchuan, LIANG Yanbin.
Development and Application of a Sliding Equipment System Based on Single-pulse
Scanner and Rangefinder for Pile Inventory
[J]. Metal Mine, 2024, 53(5): 144-.
|
[2] |
SHAO Anlin LIU Chang, YUE Xingtong, WANG Huaiyuan, ZHANG Xingfan, WANG Liancheng.
Path of High-quality Development of China′s Mineral Resources Industry in the New Era
[J]. Metal Mine, 2024, 53(01): 2-6.
|
[3] |
SONG Peng, Xu- Hui, Fan-Xue-Feng, Shu-Xian-Liang- .
Framework Implementation and Key Technologies of MES System for Mining-Beneficiation in Metal Mines
[J]. Metal Mine, 2020, 49(04): 135-141.
|
[4] |
CHEN Jing-He.
Innovation and Practice of the “Five-process Integration” Engineering Management Mode in the Development of Mines Like Zijinshan Gold and Copper Mine
[J]. Metal Mine, 2019, 48(08): 1-6.
|
[5] |
YE Shan-Shan, ZHANG Jin-De, PAN Li, YANG Xue, YU Yang.
Ecological Environmental Cost Accounting of Mining Area Based on the Green Mine:A Case from a Mining Area in the North China Plain
[J]. Metal Mine, 2019, 48(04): 168-174.
|
[6] |
LI Hong-Liang, WANG Li-Juan, MA Song, YIN Heng, JIA Hu-Jun, JIA Jie-Qiong.
Assessment of Flood Discharge Capacity of Tailings Pond Drainage System in Dissecting Area Based on "Integration of Space, Sky and Ground"
[J]. Metal Mine, 2019, 48(01): 181-186.
|
[7] |
ZHU Long-Ji, WANG Qi.
The Integrated Circuit of Hybrid Charging and Drive System for a Type of Mine Motor Vehicle
[J]. Metal Mine, 2018, 47(11): 161-165.
|
[8] |
FENG Zhi-Dong, LI Xiong-Huai, LU Liu-Wei.
Using Data Agents Synchronization Method to Realize the Integration of the Old Business Systems of Mine
[J]. Metal Mine, 2018, 47(01): 156-160.
|
[9] |
GAO Xu-Guang, LIU Hui.
Dynamic Evolution Prediction of Surface Subsidence Ponding Caused by Multi-layers Coal Mining in the High Groundwater Level Area
[J]. Metal Mine, 2017, 46(10): 39-42.
|
[10] |
XU Hong-Liang, JIANG Ren-Yi.
Key Technology and Design Practice of Integration of Underground Mining and Beneficiation Engineering
[J]. Metal Mine, 2016, 45(10): 50-53.
|
[11] |
WANG Jing-Yu, ZHANG Ke, HU Yan-Dong, ZHOU Wei.
Overview on High Pressure Grinding Roll-Dry Classification-Low Intenity Magnetic Separation Integration System Technology
[J]. Metal Mine, 2016, 45(06): 101-106.
|
[12] |
LIU Ya-Jing, Yao-Ji-Ming, RAN Wei-Wei.
Design and Realization of GIS System for Mining Method Selection of Metal Mine
[J]. Metal Mine, 2016, 45(03): 119-123.
|
[13] |
HE Xiang, YANG Tian-Hong, 南Shi-Qing , HUANG Qing-Yun, LI Yang.
Application of the Virtual Reality Technology in Open-pit Slope Engineering
[J]. Metal Mine, 2015, 44(02): 133-138.
|
[14] |
ZHAO Yong, YANG Tian-Hong, JIE Lian-Ku, ZHU Gen-Peng, HU Gao-Jian, ZHANG Fei.
Hongling Lead-zinc Mine′s Virtual Reality Technology
[J]. Metal Mine, 2015, 44(01): 98-103.
|
[15] |
NING Hui-Dong, MENG Li-Fang.
Dual-way Long-distance Pipeline Transport of Water and Iron Concentrate,Dry Tailings Stockpiling Technique
[J]. Metal Mine, 2014, 43(08): 108-110.
|