Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2011, Vol. 40 ›› Issue (04): 9-11.

Previous Articles     Next Articles

Study on Large Spacing Structure with Non-pillar Sublevel Caving in Jinshandian Iron Mine

Huang Ze,Sheng Jianlong,Li Xun   

  1. Wuhan University of Science and Technology
  • Online:2011-04-15 Published:2011-04-08

Abstract: Through the contrast experiments, the investigation on large spacing structure of non-pillar sublevel caving in Jinshandian Iron Mine is made to get reasonable parameters for recovering the crestal ore by non-dilution or low dilution.It is best of stopping mining when the mixed rate of gauges is 10% and the recovery rate is the highest.The experimental data shows that when the height of lift with the spacing of passage is 15cm×15cm, the recovery rate is high.Also, the height of crestal residual ore is in accord with the fixed value, which contributes to a good recovery at next sublevel.

Key words: Iron mine, Non-pillar sublevel caving, Large spacing, Crestal residual ore