Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2011, Vol. 40 ›› Issue (06): 13-15+28.

Previous Articles     Next Articles

Study on Mining Sequence and Ore-drawing Control Technique of High-stage Backfill Mining

Xu Wenbin1,2,Song Weidong1,2,Wan Haiwen1,2,Wang Wenxiao3,Wang Wenjing3   

  1. 1.State Key Laboratory of High-Efficient Mining and Safety of Metal Mines, Ministry of Education;2.School of Civil and Environment Engineering, University of Science and Technology Beijing;3 Masteel Group Gushan Mine Co., Ltd.
  • Online:2011-06-08 Published:2011-06-09

Abstract: Based on geologic condition of Houguanyinshan ore-body in Masteel Gushan Mine, FLAC2D simulation soft is used to analyze the changes of stress, deformation and plasticity of wall rock caused by stage backfill mining. Then the change rule of stress, deformation and plasticity is obtained. Five mining sequence schemes are contrasted to determine the mining sequence of ore-room in panels. And ore-drawing order of the stage backfill mining is also put forward by referring to the granule mechanics, which can guide the practical production in mine.

Key words: Iron mine, Stage backfill mining, Mining order, Ore-drawing controlling