[1] |
HU Yingpeng, TAN Baohui, DING Hangxing, ZHANG Hongchang, LI Yuntao, CUI Yu.
Study on the Technology of Induced Caving to Control the Hazard of Slope Rock Movement in the#br#
Open-Pit Underground Wedge Transition Method
[J]. Metal Mine, 2024, 53(3): 37-.
|
[2] |
ZHANG Weizhong, WANG Weiqing, PENG Yali, KANG Qinrong, ZHANG Dianji.
Optimization of Room-and-pillar Mining Method Extraction for Section IV of Wawu Phosphate Mine Based on AHP-FUZZY
[J]. Metal Mine, 2022, 51(09): 18-24.
|
[3] |
KE Lihua, ZHANG Ying, LI Quanming, LI Zhentao, YE Yicheng, Wang Qihu, HUANG Changchang.
Multi-level Fuzzy Comprehensive Evaluation Model Based on EAHP for Dam Break Risk of Tailings Pond
[J]. Metal Mine, 2020, 49(11): 37-43.
|
[4] |
YANG Yu-Jiang, LU Zeng-Xiang.
Stability Analysis of Residual Slope of Open-pit Mine with Variation of Underground Mining Depth
[J]. Metal Mine, 2019, 48(01): 168-173.
|
[5] |
YU Chen, TANG Ming-Jie, WANG Da-Guo, LI Sha-Sha.
Evaluation on Suitability of Land Reclamation in Open Pit Based on FAHP-Entropy Weighting Method
[J]. Metal Mine, 2018, 47(11): 138-143.
|
[6] |
XUE Sen, LI Wen-Ping, GUO Qi-Chen, LIU Shi-Liang, SUN Meng-Ya, FAN Bao-Jiang.
Prediction of Water Abundance of the Roof Confined Aquifer Strata Based on FAHP-GRA Evaluation Method
[J]. Metal Mine, 2018, 47(04): 168-172.
|
[7] |
HU Tao, XIA Hong-Chun, ZHAO De-Shen.
AHP-Entropy Weight Analysis on Safety Sensitivity of Water Inrush during Mining
[J]. Metal Mine, 2016, 45(11): 162-166.
|
[8] |
JIANG Fu-Liang, YANG Zeng-Guang, LI Xiang-Yang, ZHANG Shuai, LI Ming.
Comprehensive Evaluation of Mine Ventilation System Safety Based on Combination Weighting Extension Model
[J]. Metal Mine, 2016, 45(05): 168-172.
|
[9] |
WANG Wen-Cai, ZHAO Jing-Wen, FU Peng, ZHANG Pei, WANG Xin-Zhou, ZHANG Gen-Yuan.
AHP and Fuzzy Mathematics Assessment of Open-pit Mine Ecological Environment
[J]. Metal Mine, 2016, 45(01): 146-150.
|
[10] |
XUE Zhen-Lin, WU Ai-Xiang, WANG Yi-Ming, HUANG Ming-Qing, YANG Peng.
Weighting Analysis of Transportation and Lift Limiting Factors Based on AHP
[J]. Metal Mine, 2014, 43(03): 124-127.
|
[11] |
CHANG Jun, SHANG Tao, FANG Jian, SUN Yu-Ting.
Analysis on Damage Factors for Surface Miner
[J]. Metal Mine, 2014, 43(01): 112-115.
|
[12] |
GONG Jian, HU Nai-Lian, ZHANG Yan-Kai, WANG Xiao-Dong.
Optimization of Mining Methods in High-Altitude Areas Based on AHP-FCE
[J]. Metal Mine, 2013, 42(09): 1-5+9.
|
[13] |
LI Tong-Peng, BAI Lin.
Influences of the Transition of Open-pit from Underground Mining to the Safety of the Surface Mine Railway
[J]. Metal Mine, 2013, 42(08): 141-142+146.
|
[14] |
SUN Lin-Lin, YOU Chun-An, LIU Jian-Xin, SUN Ling-Zhi.
Structural Design of Compound Artificial Boundary Pillar During Transition from Open-pit to Underground Mining
[J]. Metal Mine, 2013, 42(05): 5-9.
|
[15] |
LIU Zhan-Wei, WANG Jian, LI Shu-Tao.
Analysis on the Mining Technology on the Transition from Open-pit to Underground Mining at Jinshan
[J]. Metal Mine, 2013, 42(01): 42-45.
|