Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2011, Vol. 40 ›› Issue (07): 47-50+73.

Previous Articles     Next Articles

Discussion on the Treatment Scheme of Mined-out Area of No.2 Ore Body of a Multi-metal Mine in Inner Mongolia

Zhang Fei1,Tian Rui1,Jian Yurong2,Wang Jianjun3   

  1. 1.Inner Mongolia University of Science and Technology;2.Inner Mongolia Dongshengmiao Mining Co.,Ltd;3.Inner Mongolia Yousejiahe Xinyuan Mining Investment Co.,Ltd.
  • Online:2011-07-08 Published:2011-07-11

Abstract: The exposed upper plate and roof area of the No.2 ore body mined-out area of a multi-metal mine in Inner Mongolia is about 0.1 million square meters,and the mined-out area is in irregular shape with wide distribution and staggered overlapping.According to the status of mined-out and the existing production facilities,the method of compulsory caving rock on the plate and inducing rock avalanche on the disk gradually filling mined-out area is recommended through comparative analysis,forming the buffer security cushion with a certain thickness above the operation area.Also,how to determine the safe thickness of the buffer cushion is researched,thus providing a reference for the similar large mined-out area.

Key words: Multi-metal mine, Treatment of mined-out area, Caving wall-rock, Buffer cushion