Metal Mine ›› 2011, Vol. 40 ›› Issue (08): 119-121.
Previous Articles Next Articles
Zhang Xiaoya1,Yin Baochang2,Fan Qingpeng2
Online:
Published:
Abstract: Taking Fuquan mining area for example,the paper briefly described the selection of the known control network,the layout and the establishment of the surface control network,and made the adjustment calculation and precision analysis on them.Meanwhile,the significance of the surface control network to the connection survey between the surface and the shaft,the control survey of mine roadway,and long-term planning of the mine was expounded.
Key words: Control survey, Control network, Accuracy analysis
ZHANG Xiao-Ya, YIN Bao-Chang, FAN Qing-Peng. The Control Survey and Accuracy Analysis in Fuquan Mining Area[J]. Metal Mine, 2011, 40(08): 119-121.