Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2011, Vol. 40 ›› Issue (10): 139-143.

Previous Articles     Next Articles

Study of Ventilation System Optimization for 20 million t/a Project of Southern Mining District of Sijiaying Iron Mine

Wu Lengjun1,Song Aidong2,Zhou Wei1,Ju Weiwei1,Jia Anmin1   

  1. 1.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.;2.Mine Design Company,Hebei Iron and Steel Group Co.,Ltd.
  • Online:2011-10-11 Published:2011-10-12

Abstract: 20 million t/a phase Ⅲ project of Sijiaying Iron Mine is the largest underground mine in construction at domestic.Through the integrated techniques of ventilation optimization of multi-stage station,optimization of the station,and computer networks resolving,many problems in ultra-large underground mines are resolved such as small air volume,unreasonable air distribution in the system,lack of ventilation,unreasonable settings of stations and selection of fans.All these provide a reliable technical security for the safe and smooth construction of phase Ⅲ project of Sijiaying Iron Mine.

Key words: Ultra-large underground mine, Multi-stage station, Separate ventilation, System optimization