Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2012, Vol. 41 ›› Issue (11): 116-120.

Previous Articles     Next Articles

Optimization of Underground Metal Mine Production Plan Based on Heterogeneous Data Integration Technology

Yao Xulong1, Hu Nailian1,Liu Dabin2,Li Guoqing1   

  1. 1.Civil and Environmental Engineering School,University of Science and Technology Beijing;2.Sanshandao Gold Mine,Shandong Gold Group (Laizhou)
  • Online:2012-11-15 Published:2012-11-27

Abstract: All information produced by The 3D mining software containing reserves,grade,three-dimensional block model of the stope,the stope geological reserves management information systems,equipment management information systems,human resources management information system and production acceptance management information system were integrated into a unified production planning optimization platform by the data interface.The relevant data were heterogeneously aggregated and deeply processed.The multi-objective optimization model based on production quotas and indicators of grade was established to achieve the automatic optimization of mine production plan,and to provide a scientific basis for the plan.

Key words: Heterogeneous data, Production plan, Multi-objective optimization, Underground metal mines