Metal Mine ›› 2012, Vol. 41 ›› Issue (11): 116-120.
Previous Articles Next Articles
Yao Xulong1, Hu Nailian1,Liu Dabin2,Li Guoqing1
Online:
Published:
Abstract: All information produced by The 3D mining software containing reserves,grade,three-dimensional block model of the stope,the stope geological reserves management information systems,equipment management information systems,human resources management information system and production acceptance management information system were integrated into a unified production planning optimization platform by the data interface.The relevant data were heterogeneously aggregated and deeply processed.The multi-objective optimization model based on production quotas and indicators of grade was established to achieve the automatic optimization of mine production plan,and to provide a scientific basis for the plan.
Key words: Heterogeneous data, Production plan, Multi-objective optimization, Underground metal mines
YAO Xu-Long, HU Nai-Lian, LIU Da-Bin, LI Guo-Qing. Optimization of Underground Metal Mine Production Plan Based on Heterogeneous Data Integration Technology[J]. Metal Mine, 2012, 41(11): 116-120.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.jsks.net.cn/EN/
http://www.jsks.net.cn/EN/Y2012/V41/I11/116