Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2013, Vol. 42 ›› Issue (06): 20-22.

Previous Articles     Next Articles

Study on Application of Downward Two-step Drift Stoping with Upward Backfill

Li Shibo1,Liu Fengtao2,Wang Jingsheng2   

  1. 1.College of Mining Engineering,Hebei United University;2.Xincheng Gold Mine,Shandong Gold Mining Holdings Co.,Ltd.
  • Online:2013-06-17 Published:2013-08-09

Abstract: The upward drift stoping with backfill for instable rock mass in Nanren iron mines area was ineffective and unsafe.In view of this situation,based on the on-site inspection,test and numerical simulation,the downward two-step drift stoping with upward backfill method that keeps the roof area invariable was put forward.Combining of the optimization of roof support with hole-by-hole blasting,the on-site tests were carried out.The results indicated that this new method could simplify the construction process,improve the mining efficiency and the stoping safety.Therefore,it has demonstration significance for safely and effectively mining of instable broken rock mass in this district.

Key words: Two-step stoping, Broken rock mass, Hole-by-hole blasting, Drift backfilling