Design and Practice of Optimizing Blasting of Double-track Railway Tunnel

Liu Ming,Zhang Changsuo   

  1. College of Mining Technology,Taiyuan University of Technology
  • Online:2013-10-15 Published:2014-01-02

Abstract: Taking the entrance excavation of Xinfengpingling No.2 double-track railway tunnel as a research goal,and through the on-site monitoring on adjacent tunnel vibration blasting process in tunnel construction,Sadaovski formula is applied to making the regression analysis of the field monitoring data,and controlling maximum detonation quantity under different objective and different spacing,and hole arrangement etc..The forepoling bolts are adopted between the existing tunnel and newly-developed tunnel to enhance the stability.Through the analysis on the waveform of the vibration velocity,the maximum velocity section of delay blasting is found out.Reducing the maximum charge quantity can lower the maximum vibration velocity and control the vibration velocity of adjacent tunnel within a safe range,thus guiding the follow-on construction.

Key words: Double-track tunnel, Sublevel blasting, Blasting vibration, Sadaovski formula, Grouting and anchoring reinforcement