[1] |
DUAN Baofu, CHAI Mingxing, ZHANG Zhengxin, SUN Zongjun.
Analysis and Application of Corner Column Cutting Hole Arrangement and Millisecond Delay Blasting Effect
[J]. Metal Mine, 2023, 52(01): 151-160.
|
[2] |
QIN Peng-Fei.
Application of Limit Equilibrium and Numerical Method in Slope Engineering
[J]. Metal Mine, 2020, 49(06): 204-209.
|
[3] |
LIU Huan-Chun, Yu-Jian-Xin, Jiao-Hua-Zhe, Zhao-Wu-Sheng.
Influence of Backfill Mining in Complex Goaf on Ground Buildings
[J]. Metal Mine, 2020, 49(04): 39-45.
|
[4] |
GE Yong-Xiang, ZHANG Cong-Rui, WANG Wei, LEI Gao, REN Gao-Feng, WU Qi.
Study on the Stability of Interval Pillar Recovery under the Complex Backfilling Body in Sanxin Gold and Copper Mine
[J]. Metal Mine, 2018, 47(12): 27-33.
|
[5] |
YU Kun-Peng, REN Feng-Yu, ZHANG Dong-Jie.
High-end Wall Pillarless Sublevel Caving Method in Fluorite Mine in Xilinhot City
[J]. Metal Mine, 2017, 46(05): 44-48.
|
[6] |
HE Jin-Long, WU Yue-Sheng, LIU Ze-Dong, LIU Lei-2.
Influence Law Analysis of Different Precipitation to the Stability of Tailings Dam
[J]. Metal Mine, 2015, 44(08): 150-153.
|
[7] |
ZHU Wei, TENG Yong-Hai, ZHENG Zhi-Gang.
Field Measurement on Ground Subsidence and Overburden Failure by High Intensity Fully Mechanized Top-coal Caving Under Thick Loess
[J]. Metal Mine, 2015, 44(04): 123-126.
|
[8] |
MEI Fu-Ding, WANG Ru-Kun, XIA Hong.
Application Study of Caving Method and Filling Method Combined Mining in Jinshandian Iron Mine
[J]. Metal Mine, 2013, 42(10): 21-24.
|
[9] |
YUAN Zi-You.
Numerical Calculation of Tailings Dam-break and its Influence on Downstream Areas
[J]. Metal Mine, 2012, 41(08): 156-159.
|
[10] |
SONG Wei-Dong, WANG Xin, DU Jian-Hua.
Surface Deformation Law of Chengchao Iron Mine Induced by Pillarless Sublevel Caving Mining Method
[J]. Metal Mine, 2012, 41(07): 9-12+18.
|
[11] |
CHEN Wei-Wei, CHEN Cong-Xin, XIAO Guo-Feng.
Monitoring Analysis of Well Area Deformation and Disposal Propose in Chengchao Iron Mine
[J]. Metal Mine, 2012, 41(04): 136-140.
|
[12] |
WEI Si-Xiang, SONG Jin-Hu, JING Hong-Wen.
Numerical Analysis of the Stress in the Surrounding Rock of the Dynamic Pressure Tunnel with Inclined Seams
[J]. Metal Mine, 2012, 41(03): 37-41.
|
[13] |
LI Ju-Zhen, HE Li-Hui, SUN Chuan.
The Numerical Simulation of Central Nanminghe Iron Mine Block′s Mining Parameters Optimization
[J]. Metal Mine, 2012, 41(01): 36-39+43.
|
[14] |
CHEN Dian-Qiang, HE Feng, WANG Lai-Gui.
Numerical Calculation of the Tailings Dam Failure in Fengcheng City
[J]. Metal Mine, 2009, 39(10): 74-76+80.
|
[15] |
TANG Ming-Fu, ZHOU Ming-Fang, LI Fu-Ping, LI Yi, YAO Bai-Hua.
Mechanism and Forecast of the Ground Subsidence in Daxin Lead-Zinc Mine in Guangxi
[J]. Metal Mine, 2009, 39(02): 151-153.
|