3D Visualization Programming Process of Production Plan Scheduling for Open Pit Mine

Xu Lisheng1,2,3,Dai Bibo1,2,3,Jiang Pengfei1,2,3   

  1. 1.National Engineering Research Center of High Efficiency Cyclic Utilization of Metal Mineral Resources,Maanshan 243004,China;2.Sinosteel Maanshan Institute of Mining Research Co.,Ltd.,Maanshan 243004,China;3.State Key Laboratory of Safety and Health for Metal Mines,Maanshan 243004,China
  • Online:2014-02-14 Published:2014-02-25

Abstract: According to the basic characteristic of the open pit mine production and the requirement of production plan,some key techniques about the scheduling and the system structure based on 3D visualization were studied.3D database platform was built as the foundation based on 3D visualization modeling and design technology,and the open pit production was decomposed into individual task unit,on which were made the assignment,decomposition and sequencing to generate a variety of schedules through various statistical methods.Finally,the feasibility of this technology and its superior performance were verified through engineering examples.The results showed that the application of 3D visualization technology in mine production schedule planning was reasonable and efficient.The complex production schedule became clear in the 3D environment.It greatly reduces the complexity and difficulty of open pit production scheduling plan,and also plays a certain impetus role in digitized advancement of mine enterprise in our country and owns the significance in practice.

Key words: Visualization, Production plan scheduling, Open pit mine, Task unit