[1] |
CHEN Lin, HUANG Mingqing, TANG Shaohui, ZHANG Ming, LIU Qingling.
Optimization and Stability Analysis of Stope Structure Parameters of Large-diameter Deep Hole Open Stoping with Subsequent Filling
[J]. Metal Mine, 2022, 51(11): 44-51.
|
[2] |
HU Chao DING Chenggong JIN Changyu DONG Longbin CHEN Wujiu.
Study on Stope Stress and Deformation Law and Stability of Stage and Subsequent Filling Method
[J]. Metal Mine, 2021, 50(07): 58-65.
|
[3] |
LI Xiao-Gang, WANG Xiang-Gui, HU Yong-Quan.
Research on Energy Saving and Drag Reduction in Mine Ventilation System
[J]. Metal Mine, 2019, 48(04): 184-188.
|
[4] |
LIU Jian-Dong, JIE Lian-Ku, CAO Hui.
Study on Structural Parameters Optimization and Stability of Stope for Large-scale Backfill Mining
[J]. Metal Mine, 2018, 47(12): 10-13.
|
[5] |
CHENG Chong-Qiang, DONG Long-Bin, XU Shi-Da.
Simulation and Optimization of Deep Stope Mining Sequence in Hongtoushan Copper Mine
[J]. Metal Mine, 2016, 45(09): 66-68.
|
[6] |
HE Zhi-Liang, WANG Da-Guo, LI Bin, FENG Liang-2.
Analysis of the Stopes Stability in Different Stages of Stoping and Filling under Complicated Stress Condition
[J]. Metal Mine, 2016, 45(06): 24-31.
|
[7] |
LIU Zhi-Yi, GAN De-Qing, XUE Zhen-Lin, ZHAO Hai-Xin, HE Shui-Qing.
Optimization of Structure Parameters and Backfill Ratio of the Stope Based on FLAC3D
[J]. Metal Mine, 2016, 45(03): 25-29.
|
[8] |
YANG Lei, QIU Jing-Ping, XING Jun, SUN Xiao-Gang.
Optimization of Stope Structure Parameters based on Strength Match between Backfill and Rock Mass
[J]. Metal Mine, 2016, 45(03): 10-14.
|
[9] |
ZHU Bi-Yong, YANG Wei, WANG Xin-Min.
The Permanent Pillar Arrangement and the Stoping Sequence under Large-scale Backfill Body
[J]. Metal Mine, 2015, 44(07): 21-24.
|
[10] |
LI Xiao-Shuang, LI Yao-Ji, WANG Meng-Lai, ZHU Jian-Xin.
Stability of the Pillar and Stope Structure of Optimization of Gently Inclined and Medium Thick Phosphate Rock
[J]. Metal Mine, 2015, 44(05): 44-47.
|
[11] |
QIU Jing-Ping, WANG Zhen, XING Jun, SUN Xiao-Gang.
Stope Structure Parameters Optimizing on Dilokong Chromium Mine in South Africa
[J]. Metal Mine, 2014, 43(10): 9-12.
|
[12] |
PENG Chao, GUO Qi-Feng, JI Dong, ZHAO Liang, REN Fen-Hua.
Application of Fuzzy Comprehensive Analysis Based on Multiple Weights to Optimization of Stope Structure Parameters
[J]. Metal Mine, 2014, 43(04): 22-27.
|
[13] |
LIU Dong, JIN Chang-Yu, XIA Zi-Feng, DONG Long-Bin, ZHAO Pan-Pan.
Research on the Stope Span Optimization of Jiaojia Gold Mine with Fractured Rock Mass
[J]. Metal Mine, 2014, 43(02): 18-21.
|
[14] |
ZHANG Jin-Jun, HU Wen-Da, WANG Yi-Ming, LIU Xiao-Hui, YANG Qing-Ping.
Fuzzy Matter-element Evaluation for Ore-rock Stability in Chambishi Copper Mine
[J]. Metal Mine, 2013, 42(04): 24-28.
|
[15] |
LI Xing-Guo, ZHAO Dong-Yin.
Stope Stability Influenced by Underhand-Stoping and Consolidated-Backfilling Sequence of Hexagonal-Drift with FLAC Simulation
[J]. Metal Mine, 2012, 41(01): 13-17.
|