Metal Mine ›› 2015, Vol. 44 ›› Issue (10): 18-23.

Previous Articles     Next Articles

Application and Research of Pre-splitting Blasting In Dagushan Iron Mine

Wang Heping,Guo Lianjun,Zhang Daning,Wang Le,Gao Yuan,Qi Yongdong   

  1. School of Mining Engineering,University of Science and Technology Liaoning,Anshan 114051,China
  • Online:2015-10-15 Published:2015-11-20

Abstract: The blasting near slope of Dagushan open-pit iron usually adopts pre-split blasting technology.In order to seek for the optimal pre-splitting blasting parameters,LS-dyna software was used to make numerical simulations of pre-splitting blasting process under different blasting parameters.From analysis on the numerical simulation,the pre-splitting blasting parameters of Dagushan iron mine were achieved,such as the optimal pre-splitting blast hole spacing and the decoupling coefficient.According to the simulated optimal pre-splitting blasting parameters,contrast tests between field coupling pre-splitting blasting and decoupling blasting were made.The retention effect of the decoupling pre-split blasting is notable and the small slope vibration from blasting construction was conducive to maintaining the slope stability,and getting a good pre-splitting blasting effect.The blasting parameters determined by numerical simulation can be applied in Dagushan Iron Mine end-slope blasting,which has practical guiding significance for the on-site construction blasting.

Key words: Pre-split blasting, Blasting vibration, Numerical simulation, Pre-splitting blasting parameters, Decoupling coefficient