Metal Mine ›› 2015, Vol. 44 ›› Issue (12): 10-14.
Previous Articles Next Articles
Jiao Junkai,Zheng Cuimin,Li Xiaodong,Zhao Yusong
Online:
Published:
Abstract: The comprehensive analysis on engineering construction environment of water karst mine of Nanlizhuang iron mine in Hanxing,technical issues of water inrush and flood control,shaft-flooding events,and aquifer water inrush mechanism are carried out.Based on these,and by means of systematic research on integrated technical solution of water prevention and control “exploring,blocking,cutting”,such techniques and measures as S hole exploration and grouting,rockwall firmness with advanced small pipes and chemical grout applicable are applied during work progress to successfully complete auxiliary shaft excavating and lining.It can be used as a reference by other mine constructions with similar working environment.
Key words: Vertical shaft, Water prevention and control, Excavating and lining construction
JIAO Jun-Kai, ZHENG Cui-Min, LI Xiao-Dong, ZHAO Yu-Song. Exploration for Water Prevention and Control Project of Auxiliary Shaft Excavating and Lining in Nanlizhuang Iron Mine[J]. Metal Mine, 2015, 44(12): 10-14.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.jsks.net.cn/EN/
http://www.jsks.net.cn/EN/Y2015/V44/I12/10