Welcome to Metal Mine! Today is Share:
×

扫码分享

Metal Mine ›› 2017, Vol. 46 ›› Issue (05): 49-53.

Previous Articles     Next Articles

Research on the Smooth Blasting Technology in Beishan Pit Exploration Facilities in Gansu Province

Man Ke1,2,Wang Xiyong1,2,Chen Liang1,2,Wang Ju1,2,Pan Shengjun3   

  1. 1.Beijing Research Institute of Uranium Geology,Beijing 100029,China;2.Key Laboratory of China National Nuclear Corporation on High Level Radioactive Waste Geological Disposal,Beijing 100029,China;3.Jiangxi Nuclear Industry Construction Limited Corporation,Nanchang 330006,China
  • Online:2017-05-15 Published:2017-10-18

Abstract: The Beishan pit exploration facilities in Gansu province is the landmark facilities of the research and construction phase of the high-level radioactive waster geological disposal engineering in our country.Based on the smooth blasting method,the blasting parameters of the Beishan pit exploration facilities have been designed,which is much more suitable to this project.Furthermore,the smooth blasting effects is analyzed under the different kinds of blasting parameters (spacing of peripheral holes),the scientific of smooth blasting parameters is verified.In advance.It should be noticed that,blasting method includes numerous blasting parameters,which interaction each other.Those blasting parameters obtained just on the spacing of peripheral holes,and the results and theoretical knowledge could be applied to the blasting and excavation of the deep geo-engineering and the high-level radioactive waster geological disposal.

Key words: Smooth blasting, Blasting theory, Blasting parameters, Pit exploration facilities