Determination of Reasonable Width of Isolation Pillar between Caving Method and Filling Method in Same Level Mining Areas of Daye Iron Mine
Wang Liubao,Liu Yanzhang,Yin Dong,Jiang Wei,Zhang Guoquan,Cai Yuantian
1. College of Resources and Environmental Engineering, Wuhan University of Science and Technology, Wuhan 430081,China; 2. Hubei Key Laboratory for Efficient Utilization and
Agglomeration of Metallurgic Mineral Resources,Wuhan 430081,China; 3. Daye Iron Mine Limited Corporation,WISCO Resources Group, Huangshi 435006,China
WANG Liu-Bao, LIU Yan-Zhang, YIN Dong, JIANG Wei, ZHANG Guo-Quan, CAI Yuan-Tian. Determination of Reasonable Width of Isolation Pillar between Caving Method and Filling Method in Same Level Mining Areas of Daye Iron Mine[J]. Metal Mine, 2020, 50(05): 89-94.