Metal Mine ›› 2011, Vol. 40 ›› Issue (08): 119-121.

Previous Articles     Next Articles

The Control Survey and Accuracy Analysis in Fuquan Mining Area

Zhang Xiaoya1,Yin Baochang2,Fan Qingpeng2   

  1. 1.Department of Civil Engineering, Xi'an Railway Vocational & Technical Institute; 2.Sinosteel Shandong Fuquan Mining Co.,Ltd.
  • Online:2011-08-09 Published:2011-08-11

Abstract: Taking Fuquan mining area for example,the paper briefly described the selection of the known control network,the layout and the establishment of the surface control network,and made the adjustment calculation and precision analysis on them.Meanwhile,the significance of the surface control network to the connection survey between the surface and the shaft,the control survey of mine roadway,and long-term planning of the mine was expounded.

Key words: Control survey, Control network, Accuracy analysis