Abstract: 20 million t/a phase Ⅲ project of Sijiaying Iron Mine is the largest underground mine in construction at domestic.Through the integrated techniques of ventilation optimization of multi-stage station,optimization of the station,and computer networks resolving,many problems in ultra-large underground mines are resolved such as small air volume,unreasonable air distribution in the system,lack of ventilation,unreasonable settings of stations and selection of fans.All these provide a reliable technical security for the safe and smooth construction of phase Ⅲ project of Sijiaying Iron Mine.
Key words: Ultra-large underground mine, Multi-stage station, Separate ventilation, System optimization
WU Leng-Jun, SONG Ai-Dong, ZHOU Wei, JU Wei-Wei, JIA An-Min. Study of Ventilation System Optimization for 20 million t/a Project of Southern Mining District of Sijiaying Iron Mine[J]. Metal Mine, 2011, 40(10): 139-143.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.jsks.net.cn/EN/
http://www.jsks.net.cn/EN/Y2011/V40/I10/139