[1] |
HUANG Xuquan, WU Qinnan, ZHAO Xiaorong, DONG Jiangfeng, LI Qian.
Study on Mix Proportion Design and Performance of High Volume Phosphogypsum Road Base Material
[J]. Metal Mine, 2024, 53(3): 296-.
|
[2] |
HU Jingwen, NIE Wen, LU Song, WANG Zhenhao, Pooya Saffari.
A Static Bayesian-based Model for Evaluating Rainfall-induced Tailings Dam Instability
[J]. Metal Mine, 2023, 52(11): 268-275.
|
[3] |
ZHANG Wenge, WANG Jiachuang, DONG Longjun, GONG Suwen, LUO Caiyan, HAO Chenliang, CAO Heng, YAN Xianhang.
Optimization Design of Microseismic Monitoring Scheme for High Steep Rock Slope and Identification of Hidden Danger Zones
[J]. Metal Mine, 2023, 52(09): 69-75.
|
[4] |
JING Xiaofei, MAO Jingxin, LI Xiaoshuang, XIE Dongxu, NIE Wen, WU Shangwei.
Study Progress and Prospect of Overtopping Erosion Failure Mechanism and Process of Tailings Dam
[J]. Metal Mine, 2023, 52(05): 86-96.
|
[5] |
ZHANG Xianwei, ZHOU Mingliang, YUAN Zhitao, WEI Bo, LI Lixia, ZHANG Qiang, ZHANG Junfei.
Development and Application of a Permanent Magnet Combined Box Magnetic Separator
[J]. Metal Mine, 2023, 52(03): 222-226.
|
[6] |
WU Hao, FAN Hongdong, ZHENG Chunliu, LIU Jiuli.
Deformation Monitoring and Analysis of Tailings Dam Based on DS-InSAR:A Case Study of Brumadinho Mine in Brazil
[J]. Metal Mine, 2023, 52(03): 169-176.
|
[7] |
YI Sicheng, KANG Ximing, WU Hao, HU Shaohua.
Outlier Diagnosis of Tailings Dam Displacement Monitoring Data Based on IF-CM-LOF
[J]. Metal Mine, 2022, 51(11): 208-215.
|
[8] |
LI Yangyang, ZHAO Xingdong, DAI Bibo, LI Huaibin.
Stability Analysis and Control of Surrounding Rock of 1 500 m Service Shaft Bedrock Section in Sishanling Iron Mine
[J]. Metal Mine, 2022, 51(11): 64-70.
|
[9] |
ZHU Quanjie, ZHANG Zhen, LIANG Juan, ZHANG Jiaofu, LIU Xiaohui, WANG Zhishuai.
Study on the Optimization Design of Blasting Parameters and Threedimensional Visualization of Mine Roadway Excavation
[J]. Metal Mine, 2022, 51(07): 120-127.
|
[10] |
CAI Xingqi, DONG Wenming, TAN Qiren, YU Zhi, BI Lin.
Blasting Process Optimization Based on Grade Control Model in Openpit Uranium Mine
[J]. Metal Mine, 2022, 51(07): 105-112.
|
[11] |
NIE Wenlin, YANG Xiaoyong FANG Jianjun CHEN Jia.
Optimizing Process Parameters of Bismuth Flotation for a Copper Tailings in Yunnan Based on Mixture Design and Response Surface Methods
[J]. Metal Mine, 2021, 50(05): 109-114.
|
[12] |
YU Qinglei, PU Jiangyong, LE Zhihua, CHU Jixiang, JIANG Zhaoyang, GAO Xiaolong.
Study on the Broken Rock Zone of Roadway in Skarn Copper-iron Mine Based on Geological Radar
[J]. Metal Mine, 2021, 50(03): 46-53.
|
[13] |
ZHONG Xiaoyu, ZHAO Qingfeng, SUN Xiaoyu, SUN Jian, XIAO Kaitai.
Study on Overall Architecture Design and Key Technology of Open-pit Mine Navigation System
[J]. Metal Mine, 2020, 49(09): 184-190.
|
[14] |
YANG He- , LU Zeng-Xiang, Zhang-Guo-Jian- .
Experimental Analysis of Particle Size and Density of Cover Layer Based on Central Composite Response Surface
[J]. Metal Mine, 2020, 49(06): 150-155.
|
[15] |
CHEN Yi-Lin, TANG Xiao-Ling, LI Yan-Jun, LIU Jin-Chang, SUN Yong-Sheng.
Expansion Continuous Experimental of Suspension Magnetization Roasting for JISCO Tailings
[J]. Metal Mine, 2020, 50(05): 178-184.
|